Community Research and Development Information Service - CORDIS

Abstract

The installation and testing of a direct ignition, pulverised fuel burner for large pulverised fuel, tangential flow boilers is described. This 10.7 MW(th) burner was installed in the 600 MW Emile Huchet station, unit 6, of the Houillères du Bassin de Lorraine. The tests, carried out in 1986, were successful. The burner was tested in normal operating and safety conditions, using coal with a wide range of ash contents.

Additional information

Authors: ROLLIN J P, Houillières du Bassin de Lorraine, Freyming-Merlebach (FR)
Bibliographic Reference: EUR 13092 FR (1990) 14 pp., FS, ECU 5
Availability: (2)
ISBN: ISBN 92-826-1949-4
Follow us on: RSS Facebook Twitter YouTube Managed by the EU Publications Office Top