Community Research and Development Information Service - CORDIS


During the months of April, May and June 1991, inspection visits to all the PASSYS test sites have been made by order of the BBRI, the coordinator of phase II of the European project PASSYS (DG XII). During March, inspection sheets were prepared for the visits, covering most topics, such as the sensors, instrumentation, computer equipment and test site description, and they are presented in this paper. After the visits to three test sites in April, a preliminary report was presented at the Test Site Management (TSM) subgroup meeting in Porto, May 1991. Recommendations regarding the labelling and positioning of sensors were also presented in a report and were worked out by the TSM for adoption by all the PASSYS teams. After the last visit in June, a final draft of this report was compiled for the coordinator and the subgroup leader of the TSM. The locations of the test cells and climatic sensors at the test sites are described schematically.

Additional information

Authors: BLOEM J J, JRC Ispra (IT)
Bibliographic Reference: Paper presented: PASSYS TSM Meeting, Athens (GR), Oct. 9-10, 1991
Availability: Available from (1) as Paper EN 36543 ORA
Record Number: 199210056 / Last updated on: 1994-12-02
Original language: en
Available languages: en