Community Research and Development Information Service - CORDIS

Abstract

This report describes the experimental equipment of the Phebus FP project as it existed in Spring 1990, and the underlying analytical studies. It predicts the first in-pile test, with fresh fuel, by mid-1992. The work programme has included: - seismic safety studies and civil engineering design of buildings and major components; - transition into the detailed design phase of experimental equipment and instrumentation; - first orders for large components and other long delivery items; - detailed definition of the test matrix; - adaptation of existing, and generation of specific, computation tools; - dimensioning verification of the overall design proposal and of the first irradiation test; - specific supporting studies, such as analytical aerosol experiments, FP chemistry research, gamma spectrometry system layout and neutronic calculations.

Additional information

Authors: SCOTT DE MARTINVILLE E F, CEA, Institut de Protection et de Sûreté Nucléaire de Cadarache, Saint-Paul-lez-Durance (FR);DELCHAMBRE P, CEA, Institut de Protection et de Sûreté Nucléaire de Cadarache, Saint-Paul-lez-Durance (FR);VON DER HARDT P, JRC Ispra (IT)
Bibliographic Reference: EUR 12926 EN (1992) 35 pp., MF, ECU 6
Availability: (2)
Record Number: 199210339 / Last updated on: 1994-12-02
Category: PUBLICATION
Original language: en
Available languages: en
Follow us on: RSS Facebook Twitter YouTube Managed by the EU Publications Office Top