Community Research and Development Information Service - CORDIS

Abstract

Conditional preventive maintenance will make it possible to anticipate the stoppages consequent to breakdowns in mining machines, to improve their rate of advance and to achieve a reduction in working costs as a result of the programming of stoppages for maintenance purposes. The aim was to optimise the instrumentation of the machines and the continuous data processing system by an on-line expert system, in order to move towards a system of conditional, preventive maintenance. These concepts were applied to the very recently introduced Anderson Electra 2000 electric shearers designed for high-production faces.

Additional information

Authors: LEFEVRE M, INERIS, Paris (FR);NAVARRO P, INERIS, Paris (FR)
Bibliographic Reference: EUR 14870 FR (1993) 83 pp., MF, ECU 4
Availability: (2)
Record Number: 199311204 / Last updated on: 1994-11-29
Category: PUBLICATION
Original language: fr
Available languages: fr
Follow us on: RSS Facebook Twitter YouTube Managed by the EU Publications Office Top