Community Research and Development Information Service - CORDIS

Abstract

The aim of the project was to replace three old hydraulic units by a single facility for the island's distribution network. This final report contains a description of the site and of the installation, and describes the construction and commissioning of the installation, the operation and the results, which demonstrate that the innovations brought to the site were justified.

Additional information

Authors: COMPAGNIE FRANÇAISE POUR LE DÉVELOPPEMENT DE LA GÉOTHERMIE ET DES ÉNERGIES NOUVELLES, Compagnie française pour le développement de la géothermie et des énergies nouvelles, Orléans (FR);EDA, Empresa de Electricidade dos Açores, EP (EDA), Ponta Delgada (PT);COMPAGNIE FRANCAISE POUR LE DEVELOPPEMENT DE LA GEOTHERMIE ET DES ENERGIES NOUVELLES, Compagnie francaise pour le developpement de la geothermie et des energies nouvelles, Orleans (FR)
Bibliographic Reference: EUR 15829 FR/PT (1995) 100 pp., FS, ECU 11.50
Availability: (2)
ISBN: ISBN 92-826-8749-X
Record Number: 199410950 / Last updated on: 1994-12-06
Category: PUBLICATION
Original language: pt
Available languages: fr,pt