Community Research and Development Information Service - CORDIS

Abstract

The present research concerns the operational installation of specialised systems, with the aim of developing and generalising the use of the system which has been on trial since April 1990 at the Bassin de Lorraine colliery.
The quality factor under which this research was undertaken has allowed the principal risks to be listed and the appropriate remedies to be applied; these are mainly of an organisational nature.
With this system all the sites of the Bassin de Lorraine colliery can supervise their DTF cutting machines 24 hours a day. Many anomalies have thus been avoided or reduced, thus reducing maintenance costs and operating losses. .

Additional information

Authors: MALLET J -P, Ineris, Paris (FR);LEFÈVRE M, Ineris, Paris (FR);VILLENEUVE DE JANTI P, Ineris, Paris (FR);SALZMANN H, Ineris, Paris (FR);GUILLENTZ B, Ineris, Paris (FR);SCHIRA B, Ineris, Paris (FR)
Bibliographic Reference: EUR 15245 FR (1997) 269pp., FS, ECU 45
Availability: Available from the (2)
ISBN: ISBN 92-827-9223-4
Record Number: 199710154 / Last updated on: 1997-04-01
Category: PUBLICATION
Original language: fr
Available languages: fr