Community Research and Development Information Service - CORDIS

Abstract

This study reviews the scope and extent of inservice inspection (ISI) performed on existing light water reactors (LWR) and liquid metal fast reactors (FR), with the objective of facilitating harmonization of European codes. The report identifies the major differences in the requirements of the French RSEM Code, the German KTA rules and the ISI specification for Sizewell B. Differences in the ISI of key primary circuit components, such as the RPV, steam generators, pressurizers, reactor coolant pumps and reactor coolant pipework are discussed. The study is also concerned with the ISI of liquid metal cooled fast reactors, since there are no agreed rules or codes of practice in Europe on the ISI or repair of FR components.

Additional information

Authors: ROGERSON A, AEA Technology (GB);HUDGELL R J, AEA Technology (GB);WESSELS J J, Siemens (GB);TCHILIAN J M, Framatome;SHEPARD B W O, Mitsui Babcock;HARDIE F, Mitsui Babcock;BRYANT S, National Nuclear Corporation
Bibliographic Reference: EUR 17572 EN (1999) 128pp.
Availability: Available from OOPEC Sales agents
ISBN: ISBN 92-828-5141-9
Record Number: 199910534 / Last updated on: 1999-04-01
Category: PUBLICATION
Original language: en
Available languages: en