The 10 kW m-Si PV plant, installed in 1982 on the roof of the LEEE-TISO, was the first grid connected system in Europe. In proximity of its 20-year design life, a collaboration between LEEE-TISO and the ESTI laboratory (JRC, ISPRA, RE Unit) has been started to determine the Mean Time Before Failure (MTBF) of the system, and to investigate the physical degradation mechanism in action.

Additional information

Authors: REALINI A ET AL, University of Applied Sciences of Southern Switzerland, LEEE-TISO, Canobbio (CH);SAMPLE T, JRC, Institute for Environment and Sustainability, Renewable Energies Unit, Ispra (IT);OSSENBRINK H, JRC, Institute for Environment and Sustainability, Renewable Energies Unit, Ispra (IT)
Bibliographic Reference: An oral report given at: The 17th European Photovoltaic Solar Energy Conference and Exhibition. Held in: Munich (DE), 22-26 October 2001