Community Research and Development Information Service - CORDIS

Abstract

COST Materials Action 521 was a collaborative research effort of 19 different European laboratories between 1997 and 2002. The main objective of COST 521 was to support the construction industry and owners of steel reinforced concrete buildings and structures by the technical and economic optimisation of the resources used to construct, monitor and maintain steel reinforced concrete buildings and structures. The final report of COST 521 is thus dedicated to 'end users'. It summarises the state of the art and gives valuable information on preventive measures, monitoring and maintenance for reinforced concrete structures.

Additional information

Authors: NÜRNBERGER U (EDITOR), University of Stuttgart (DE);CIGNA R (EDITOR), University "La Sapienza", Roma (IT);ANDRADE C (EDITOR), Insituto "Eduardo Torroja", Madrid (ES);POLDER R (EDITOR), TNO Building and Construction Research, Delft (NL);WEYDERT R, European Commission, DG Research, Brussels (BE);SEITZ E (EDITORS), European Commission, DG Research, Brussels (BE)
Bibliographic Reference: EUR 20599 EN (2003), 238pp. Euro: 39
Availability: EUR-OP reference: KI-NA-20599-EN-C Available from EUR-OP sales agents URL: http://publications.eu/general/en/publications_en.htm
ISBN: ISBN: 92-894-4827-X
Follow us on: RSS Facebook Twitter YouTube Managed by the EU Publications Office Top