Community Research and Development Information Service - CORDIS

FP5

Analysis of time lapse seismic data for improved management of hydrocarbon reservoirs

Project ID: ENK6-CT-2000-00108
Funded under: FP5-EESD

Abstract

Within a hydrocarbon reservoir and increase the hydrocarbon recovery rate by identification of bypassed reserves. Sub-objectives to achieve this goal are:
- to improve quantitative interpretation tools for time lapse seismic data
- to develop methods to reduce the number of un-necessary production wells and to identify undrained sections of hydrocarbons for drilling
- to improve placement of wells by using new time lapse analysing techniques
- estimate volumes of bypassed oil or gas
- provide guidelines on how to obtain precise information about production changes within a hydrocarbon reservoir
- ultimately to improve recovery factors and extraction of hydrocarbons.
Existing techniques for gathering information on how a hydrocarbon reservoir is being drained are based on a mathematical model simulation. This model is continuously being updated as new wells are drilled into the reservoir. Seismic data is the most efficient tool to obtain reservoir information between wells, and if the acquisition of seismic data is repeated after some years of production, it is possible to interpret seismic changes in terms of production related effects.
Some key results from the ATLASS project are:
- A new method for removing acquisition footprints from 4D seismic data
- Method for discrimination between velocity and compaction changes
- A new method for removing water layer multiples from 4D seismic data
- Development of laboratory equipment for acoustic monitoring of long core flooding
- Methodology for combined use of 4C and streamer data
- Guidelines for how to assess uncertainties in quantitative time lapse analysis
- New insight into key issues controlling the repeatability of 4D seismic data
Most of the above mentioned techniques have been tested on real field examples, with good results. This means that some of the key results obtained in the project already have been transferred into valuable results for the industry.

Download application/pdf (1353215)

Record Number: 6097 / Last updated on: 2004-07-13
Category: PROJ