Community Research and Development Information Service - CORDIS

Horizon 2020 project information and now also report summaries are available on CORDIS. All H2020 projects can be downloaded from the EU Open Data Portal .

My refinements


Download results of this page


Refine by:

Advanced search

Results 1 - 10 of 152
Results/page:
12 3 4 5 6 7 8 9 10 > >| 
ID: 7262-03/293/08
Start date: 1992-12-01, End date: 1993-11-30
The aim is to facilitate the safe use throughout the ECSC of mining explosives manufactured in any member state, by obtaining an up to date comparison of the different classes or groups of safety explosives that are currently available in the community.
Programme: ECSC-WORKSAFE C
Record Number: 29590
Last updated on: 1995-11-17
ID: 7262-22/244/06
Start date: 1991-01-01, End date: 1992-12-31
The research project had two main objectives: - to realize a considerable reduction in the number of lost time accidents at the Hoogovens Steelworks, in the first place by setting up a decentralised safety management system; - development of techniques for assessing the curre...
Programme: ECSC-WORKSAFE C
Record Number: 29624
Last updated on: 1995-11-17
Workshop on How to access European Commission grants in Belgium, Brussels
Start date: 2011-10-24, End date: 2011-10-25
Who should attend? Understanding how it works and how to fulfill all criteria + optimising the chances of success For all projects leaders, persons in charge of developing its organisation from public, private and non-profit sector.
Programme: JRC-ENDWEL C
Record Number: 127888
Last updated on: 2011-09-06
A self-monitoring carbon monoxide filter unit was developed to increase safety for employees who work in atmospheres containing carbon monoxide near blast furnaces and other metallurgical facilities. This was accomplished by integrating an electro-chemical sensor between the f...
Programme: ECSC-WORKSAFE C
Record Number: 20542
Last updated on: 1998-07-08
ID: 7262-01/266/01
Start date: 1992-01-01, End date: 1995-12-01
Existing CO filter systems offer only secondary parameters for assessing when they need replacing. Such parameters include increased resistance through the drying agent or the so-called odour warning (release of an odorant when moisture penetrates into the warning layer). T...
Programme: ECSC-WORKSAFE C
Record Number: 29646
Last updated on: 1995-11-17
ID: 7262-24/203/04
Start date: 1990-01-01, End date: 1991-12-31
The purpose of the project is to investigate the interrelationship of current innovations, improvement in environmental factors and reduction in the exposure to risk of workers employed in the plate finishing shop. These persons generally work outside the control pulpits and ...
Programme: ECSC-WORKSAFE C
Record Number: 29550
Last updated on: 1995-11-17
The main activities were as follows: analysis of working conditions and identification of harmful and dangerous factors; detailed environmental survey and drawing up of a risk chart; identification of the primary and secondary sources of noise; installation of automatic markin...
Programme: ECSC-WORKSAFE C
Record Number: 20541
Last updated on: 1998-07-08
Existing line protection shows deficiences in safety when operating in the presence of explosive methane and air mixtures and coal dust. Two alternative selective monitoring systems have been tested which monitor directly the three conductors of a power cable and which detect ...
Programme: ECSC-WORKSAFE C
Record Number: 19375
Last updated on: 1997-11-11
ID: 7262-03/275/01
Start date: 1992-10-01, End date: 1995-10-01
The aim of the research project is to improve conventional protection and monitoring equipment for electrical power cables in underground hard coal mines so that - cable damage and faults can be detected and located as quickly as possible and - mixtures of gas and air and coa...
Programme: ECSC-WORKSAFE C
Record Number: 29654
Last updated on: 1995-11-17
ID: 7262-03/313/01
Start date: 1993-12-01, End date: 1994-12-01
In the mining countries of the European Community different methods are still prescribed for flammability testing of conveyor belts. With the completion of the Internal Market and the associated requirement for dismantling of barriers to trade, these methods are to be harmonis...
Programme: ECSC-WORKSAFE C
Record Number: 29609
Last updated on: 1995-11-17
12 3 4 5 6 7 8 9 10 > >| 
List retrieved on: 2017-05-23
Follow us on: RSS Facebook Twitter YouTube Managed by the EU Publications Office Top