[PROJECT] GEOTHERMIE MANAGER
ID: GE./00121/95
Start date: 1996-04-01, End date: 1999-12-31
The purpose of the project is to point out the efficiency and the technico-economic viability of a new "Geothermy Manager" system which enables to : - adapt the quality of the heat uses to the maximum capacities of the geothermic resource, contrary to what is usually done, - o...
Programme: FP4-NNE-THERMIE C
Record Number: 37215
Last updated on: 1999-10-21
ID: IN./00067/97
The aim of the project is to retrofit an existing gas fired roller kiln with a microwave generator of 40 kW in the preheating zone that will produce 3% of energy needs of the kiln. This new configuration will allow an increased productivity (32%), a reduced specific consumptio...
Programme: FP4-NNE-THERMIE C
Record Number: 45206
Last updated on: 1999-10-21
L'un des projets financés par THERMIE, le segment Démonstration entrant dans le cadre du programme de recherche de l'Union européenne relatif à l'énergie non nucléaire, a pour ambition de faire une démonstration des véhicules fonctionnant au gaz naturel (VGN) dans plusieurs vi...
Programme: FP4-NNE-THERMIE C
Record Number: 10653
Last updated on: 1998-07-06
Available languages: DE, EN, ES, FR, IT
ID: BM./00015/96
Start date: 1996-12-15, End date: 1999-04-30
To utilize economically available biofuels and in origin classified refuses (REF) in the existing pulverized coal-fired power plant by gasifying the fuels in a large scale CFB gasifier and by burning the hot, low-heat value gas in the boiler. 300 GWh/a biofuels and REF will be...
Programme: FP4-NNE-THERMIE C
Record Number: 37906
Last updated on: 1998-08-04
ID: SE./00357/95
Start date: 1996-04-01, End date: 1999-04-30
PV generators, rated at 14.5 kWp and 15.2 kWp, will be installed in the facades of two buildings belonging to the Civil Aviation Authorities (STNA). Total PV power installed will be 19.7 kWp. One building is located in Brittany and the second in Athis Mons. The facade design i...
Programme: FP4-NNE-THERMIE C
Record Number: 37235
Last updated on: 1999-10-21
ID: HY./00033/96
Start date: 1996-09-01, End date: 2000-06-01
The project aims to : (i) develop a standard user-friendly self-tuning control system and standardised design techniques to permit the use of simple European siphon operated turbines at low head sites with complex net head variations, (ii) promote cross-border co-operation bet...
Programme: FP4-NNE-THERMIE C
Record Number: 37375
Last updated on: 1999-10-21
Workshop on How to access European Commission grants in Belgium, Brussels
Start date: 2011-10-24, End date: 2011-10-25
Who should attend? Understanding how it works and how to fulfill all criteria + optimising the chances of success For all projects leaders, persons in charge of developing its organisation from public, private and non-profit sector.
Programme: JRC-ENDWEL C
Record Number: 127888
Last updated on: 2011-09-06
Start date: 1999-02-12, End date: 1999-02-12
Programme: FP4-NNE-THERMIE C
Record Number: 11994
Last updated on: 1999-01-19
Available languages: DE, EN, ES, FR, IT
Start date: 1999-02-12, End date: 1999-02-12
Programme: FP4-NNE-THERMIE C
Record Number: 11994
Last updated on: 1999-01-29
Available languages: DE, EN, ES, FR, IT
Start date: 1999-02-12, End date: 1999-02-12
Programme: FP4-NNE-THERMIE C
Record Number: 11994
Last updated on: 1999-01-19
Available languages: DE, EN, ES, FR, IT
12 3 4 5 6 7 8 9 10 > >| 
List retrieved on: 2017-05-23
Follow us on: RSS Facebook Twitter YouTube Managed by the EU Publications Office Top