Community Research and Development Information Service - CORDIS

Results 1 - 10 of 54
Order by: Results/page:
12 3 4 5 6 > 
High Altitude Ice Crystals
[PROJECT] HAIC - High Altitude Ice Crystals
ID: 314314
Start date: 2012-08-01, End date: 2017-01-31
Commercial aircraft have been experiencing in-service events while flying in the vicinity of deep convective clouds since at least the early 1990s. Heated probes and engines are the areas of air-craft most prone to mixed phase and glaciated icing threat. In anticipation of re...
Programme: FP7-TRANSPORT
Record Number: 104537
Last updated on: 2017-07-02
Grey Area Mitigation for Hybrid RANS-LES Methods
ID: 605361
Start date: 2013-10-01, End date: 2015-09-30
The aeronautical industry lacks confidence in the accuracy of computational fluid dynamics (CFD) in areas of highly non-linear, unsteady flows close to the flight envelope borders, which demands advanced approaches and methods. The family of Hybrid RANS-LES Methods (HRLM) is ...
Programme: FP7-TRANSPORT
Record Number: 109107
Last updated on: 2017-06-14
More Affordable Aircraft structure through eXtended, Integrated, and Mature nUmerical Sizing
ID: 213371
Start date: 2008-04-01, End date: 2016-09-30
Even though composite materials are more and more used in modern airframes, many significant improvements are still achievable. Firstly, the substitution of the assembly of many small composite parts by a single one-shot large part provides additional weight reduction. Second...
Programme: FP7-TRANSPORT
Record Number: 89907
Last updated on: 2017-06-12
4 Dimension Contracts - Guidance and Control
ID: 266296
Start date: 2010-11-01, End date: 2013-10-31
"The 4DCo-GC project aims at exploring the concept of ""4D Contract guidance and control of the aircraft"" as a step change in air transport operations by providing a more radical and environmentally efficient solution for the management of the airspace. Scientific objectives...
Programme: FP7-TRANSPORT
Record Number: 96624
Last updated on: 2017-05-29
Advanced In-flight Measurement Techniques 2
ID: 266107
Start date: 2010-10-01, End date: 2014-09-30
Flight tests of new or modified aircraft are a necessary part of the design process and provide the final validation of the full scale aircraft design. Flight testing for certification is a critical phase as all trials proving compliance with specifications and regulations mu...
Programme: FP7-TRANSPORT
Record Number: 96623
Last updated on: 2017-05-29
Aviation Noise Research Network and Coordination
ID: 265943
Start date: 2010-12-01, End date: 2015-11-30
The X-NOISE EV Coordination Action, through its network structure and comprehensive workplan involving experts groups, scientific workshops, international cooperation seminars and a common information system, addresses the noise challenges faced by Aviation. To this end, it w...
Programme: FP7-TRANSPORT
Record Number: 97238
Last updated on: 2017-05-29
Safety (and maintenance) improVEment Through automated fLight data ANAlysis
ID: 265940
Start date: 2010-08-01, End date: 2012-12-31
The objective of SVETLANA project is to involve important EU and Russian Federation industries and research organisations from the aviation area into a common ambitious effort to enhance flight operational safety and initiate smart maintenance through intelligent and automate...
Programme: FP7-TRANSPORT
Record Number: 96996
Last updated on: 2017-05-29
Transition Location Effect on Shock Wave Boundary Layer Interaction
ID: 265455
Start date: 2012-02-01, End date: 2016-01-31
Vision-2020, whose objectives include the reduction of emissions and a more effective transport systems, puts severe demands on aircraft velocity and weight. These require an increased load on wings and aero-engine components. The greening of air transport systems means a red...
Programme: FP7-TRANSPORT
Record Number: 101445
Last updated on: 2017-05-29
Packaging of futuRe Integrated ModulAr Electronics
ID: 265413
Start date: 2010-11-01, End date: 2014-10-31
Affordable transport for the citizen relies on innovative solutions and technologies that will result in lower costs and lead-time of the aircraft and its systems. In this area, the packaging of on-board computers is an important contributor. The Packaging of futuRe Integrate...
Programme: FP7-TRANSPORT
Record Number: 97554
Last updated on: 2017-05-29
EGNOS Extension to Eastern Europe
ID: 247698
Start date: 2010-01-01, End date: 2011-10-31
The proposed project pretends to prove that the EGNOS coverage area could be extended (APV-I 99%) to cover all Eastern Europe. Moreover, a SBAS signal will be available in Poland, Romania and Ukraine to demonstrate on-ground (at user level) that in fact the steps to upgrade E...
Programme: FP7-TRANSPORT
Record Number: 206621
Last updated on: 2017-05-29
12 3 4 5 6 > 
List retrieved on: 2017-07-23
Follow us on: RSS Facebook Twitter YouTube Managed by the EU Publications Office Top