Rail RESEARCH: ETCS-VB Click here to browse the final summary report

Project Acronym: ETCS-VB
Type of contract: Shared Cost
Project title: TEST STRATEGY FOR ETCS BASED ON THE PILOT INSTALLATION VIENNA-BUDAPEST
Main contractor: ALCATEL AUSTRIA AG
Type organisation: Industry
Country: AT
Start date & duration: 1997-01-01 - 24 months
Area: Rail
Relevant tasks:
Total cost in kECUs: 2400
Total EU contribution in kECUs: 1200


Objectives of research

Main objectives:

The project ETCSVB has the main objective to set in place a pilot installation of the ERTMS, Level 1, on the Vienna-Budapest line. This first complete installation as an overlay on an existing line shall demonstrate the performance of the new European train control system and the interoperability with existing ATP systems, and shall lead to an approval or revision of ERTMS specification for subsequent wide application on the railway network in Europe. By the accompanying research work in this project and by the step-by-step approach of implementation, the risks while introducing innovations to a complex system should be minimised. The full functional system validation shall be performed for the following operating modes/functions: * full ERTMS Level 1 will be tested according to European functional Specification (FRS), * the STM Indusi developed in other projects will be used in this project, if available, * Infill function will be fulfilled for - MAV by the EVM transmission channel and for comparison in two sections with Euroloop, if available, or else by an equivalent solution with balises, - ÖBB by Euroloop, if available, and/or by Eurobalises. * a standardised, available ERTMS MMI will be used on the Vienna - Budapest test site.

Secondary objective:

Contribution to the ERTMS generalisation in Europe and in the third country (PECO)

Demo Sites:

Implementation of ERTMS Level 1 on 70 km of the Vienna-Budapest line. Specification 3/98

Links with other projects, tasks, areas, programmes, policy actions:
° ERTMS - Master Plan ° Directives 96/48 on Interoperability


Participants

Organisation Type Country
ALCATEL AUSTRIA AG Industry     AT
HUNGARIAN STATE RAILWAYS LTD. Other     HU
BUNDESFORSCHUNGS- UND PRÜFZENTRUM ARSENAL Research Organisation     AT
ÖSTERREICHISCHE BUNDESBAHNEN Other     AT
ALCATEL SEL AG Industry     DE
GEC ALSTHOM ACEC TRANSPORT S.A. Industry     BE
ANSALDO TRASPORTI S.P.A. Industry     IT

Coordinator's name: Dr. Dietrich RHEIN
Address: ALCATEL AUSTRIA AG
Scheydgasse, 41
1211 Wien
AT
Tel: +43-1-277223649
Fax: +43-1-27722173
E-mail: DIETRICH.rhein@aut.alcatel.at


European Commission Contact Point

Name: Mr. Emmanuel PARENT DE CURZON
Tel: +32-2-2963635
Fax: +32-2-2966174


Back to Top Last Updated: 20-06-2000

ProgrammesCORDISCommentsAbout©