{"contenttype":"article","language":"fr","availableLanguages":"de,en,es,fr,it,pl","rcn":"117248","id":"117248-evolvdso-supports-dsos-to-adapt-to-new-energy-reality","title":"EVOLVDSO aide les gestionnaires de r\u00e9seau de distribution \u00e0 s\u0027adapter \u00e0 la nouvelle r\u00e9alit\u00e9 \u00e9nerg\u00e9tique","teaser":"Le projet EVOLVDSO d\u00e9veloppera de nouveaux outils pour les gestionnaires de r\u00e9seau de distribution (GRD) qui sont confront\u00e9s \u00e0 une \u00e9volution de leurs r\u00f4les en vue de s\u0027adapter \u00e0 la nouvelle r\u00e9alit\u00e9 \u00e9nerg\u00e9tique.","body":"\r\n    \u003Csection\u003E\r\n      \u003CsectionBody\u003ELa part de l\u0027\u00e9nergie renouvelable dans le bouquet \u00e9nerg\u00e9tique augmente et la demande est consid\u00e9rablement proactive, aussi les syst\u00e8mes d\u0027\u00e9nergie et leur mode de fonctionnement se doivent-ils d\u0027\u00eatre \u00e9volutifs. Cette nouvelle r\u00e9alit\u00e9 \u00e9nerg\u00e9tique forcera les 3 000 gestionnaires de r\u00e9seau de distribution (GRD) en Europe \u00e0 adopter de nouvelles t\u00e2ches ou \u00e9largir leurs r\u00f4les \u00e0 l\u0027avenir. Depuis deux ans, le projet EVOLVDSO explore l\u0027ampleur de ces nouveaux r\u00f4les dans diff\u00e9rents sc\u00e9narios prospectifs. D\u0027apr\u00e8s les travaux de recherche, l\u0027\u00e9quipe d\u00e9veloppe des outils n\u00e9cessaires aux GRD en prenant en consid\u00e9ration les facteurs comme l\u0027\u00e9volution des taux de p\u00e9n\u00e9tration des sources d\u0027\u00e9nergie renouvelables distribu\u00e9es, les degr\u00e9s de progr\u00e8s technologiques et les profils d\u0027acceptation par les clients.\r\n\r\nSelon les r\u00e9sultats d\u0027EVOLVDSO, la complexit\u00e9 de la gestion renforc\u00e9e du prochain syst\u00e8me exige que le GRD passe d\u0027une approche d\u0027installation unique et simple \u00e0 une approche de gestion de syst\u00e8me de distribution active. Lors de la http:\/\/www.eusew.eu\/ (conf\u00e9rence de la Semaine europ\u00e9enne de l\u0027\u00e9nergie durable) au d\u00e9but du mois, Helena Gerard de VITO, un partenaire de projet, a expliqu\u00e9 les r\u00f4les que l\u0027\u00e9quipe a d\u00e9j\u00e0 d\u00e9finis pour les GRD: un nouveau r\u00f4le, quatre r\u00f4les \u00e9volutifs et trois r\u00f4les \u00e9largis. Le nouveau r\u00f4le, \u00e0 savoir le gestionnaire des contraintes de march\u00e9 de la distribution (Distribution Constraints Market Operator), comprend des activit\u00e9s actuellement g\u00e9r\u00e9es par les gestionnaires de r\u00e9seau de transport (GRT) comme les souplesses contractuelles et d\u0027activation. Un exemple d\u0027un r\u00f4le dit \u00e9volutif, selon EVOLVDSO, est le gestionnaire de compteurs intelligents qui se charge du d\u00e9ploiement, de l\u0027entretien et de la mise hors service de l\u0027infrastructure de r\u00e9seau intelligent.\r\n\r\nComme l\u0027expliquait Mme Gerard, \u00abLe futur mod\u00e8le de GRD sera interactif notamment au niveau des diff\u00e9rents r\u00f4les et en termes d\u0027interaction avec les autorit\u00e9s et les r\u00e9gulateurs\u00bb. Le nouveau mod\u00e8le apporte de nouveaux d\u00e9fis, non seulement pour les GRD: \u00abIl apporte de nouveaux d\u00e9fis et questions pour le r\u00e9gulateur: par exemple, le cadre r\u00e9glementaire actuel ne permet pas au GRD une flexibilit\u00e9 de contrat et plusieurs questions relatives \u00e0 la neutralit\u00e9 doivent encore \u00eatre abord\u00e9es, notamment le potentiel d\u0027attribuer certains r\u00f4les \u00e0 des tiers.\u00bb\r\n\r\nLes sc\u00e9narios prospectifs d\u00e9j\u00e0 d\u00e9finis par l\u0027\u00e9quipe seront utilis\u00e9s dans les simulations initiales ainsi que lors d\u0027une d\u00e9monstration r\u00e9aliste et des tests des m\u00e9thodes et outils s\u00e9lectionn\u00e9s. Cette phase sera suivie d\u0027une \u00e9valuation d\u0027impact et d\u0027une soumission de propositions pour un cadre r\u00e9glementaire et une structure de march\u00e9. Enfin, en pr\u00e9vision de la cl\u00f4ture du projet en d\u00e9cembre 2016, l\u0027\u00e9quipe soumettra des recommandations pour le d\u00e9ploiement \u00e0 grande \u00e9chelle et des solutions de diffusion \u00e9largie.\r\n\r\nMarco Baron, de Distribuzione ENEL (l\u0027entreprise responsable de la coordination du projet), est confiant que le projet apportera une analyse de rentabilit\u00e9 de haut niveau pour les consommateurs et les GRD et facilitera et soutiendra les march\u00e9s \u00e9nerg\u00e9tiques avec des sources d\u0027\u00e9nergie renouvelables mieux distribu\u00e9es, pour aider les consommateurs \u00e0 soutenir le syst\u00e8me d\u0027une mani\u00e8re rentable.\r\n\r\nPour plus d\u0027informations, veuillez consulter:\r\n\r\nEVOLVDSO\r\nhttp:\/\/www.evolvdso.eu\/\u003C\/sectionBody\u003E\r\n    \u003C\/section\u003E\r\n  ","basedOn":"D\u0027apr\u00e8s la couverture de la conf\u00e9rence de la Semaine europ\u00e9enne de l\u0027\u00e9nergie durable et des informations provenant du site web d\u0027EVOLVDSO.","contentCreationDate":"2015-06-30 14:22:00","contentUpdateDate":"2015-07-03 11:36:17","lastUpdateDate":"2023-03-24 01:45:25","archivedDate":"2023-03-23 00:00:00","relations":{"associations":[{"availableLanguages":"de,en,es,fr,it,pl","rcn":"117204","id":"117204-cordis-express-energy-outlook-seeking-sustainable-solutions","title":"CORDIS Express: \u00c0 la recherche de solutions durables dans le domaine de l\u0027\u00e9nergie","teaser":"L\u0027\u00e9dition de CORDIS Express de cette semaine se penche sur les efforts de recherche de l\u0027\u00e9nergie durable qui permettra \u00e0 l\u0027UE et au-del\u00e0 de rester sur ses engagements sur le climat.","contentUpdateDate":"2015-06-19 13:02:18","archivedDate":"2023-03-23 00:00:00","relations":{"categories":[{"language":"fr","code":"news","title":"Actualit\u00e9s","description":"Article: actualit\u00e9s","displayCode":"\/Actualit\u00e9s","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"fr","code":"editorial","title":"\u00c9ditorial CORDIS","description":"R\u00e9dig\u00e9 par CORDIS","displayCode":"\/\u00c9ditorial CORDIS","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"language":"any","availableLanguages":"en,any","uri":"\/docs\/news\/images\/2015-06\/20150618-1.jpg","mimetype":"image\/jpeg","size":"0","contenttype":"webItem","attributes":{"represents":"article","source":"editorial","type":"relatedImage"}}]},"contenttype":"article","attributes":{"source":"editorial","type":"relatedArticle"}},{"availableLanguages":"de,en,es,fr,it,pl","rcn":"856","code":"FP7-ENERGY","frameworkProgramme":"FP7","pga":"FP7-ENERGY","parent":{"rcn":"846\/1401\/837","code":"FP7-COOPERATION\/EC\/FP7"},"archivedDate":"2024-06-12 00:00:00","contenttype":"programme","attributes":{"source":"editorial","type":"relatedProgramme"}},{"availableLanguages":"en","rcn":"109548","id":"608732","acronym":"EVOLVDSO","archivedDate":"2024-06-18 00:00:00","relations":{"categories":[{"language":"fr","availableLanguages":"de,en,es,fr,it,pl","code":"project","title":"Projet","description":"Fiches d\u0027information du projet","displayCode":"\/Projet","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"fr","availableLanguages":"de,en,es,fr,it,pl","code":"\/25\/77\/94443578\/1269","title":"ville intelligente","displayCode":"\/ing\u00e9nierie et technologie\/g\u00e9nie civil\/ing\u00e9nierie urbaine\/ville intelligente","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"fr","availableLanguages":"de,en,es,fr,it,pl","code":"\/25\/67\/425\/1169","title":"\u00e9nergie renouvelable","displayCode":"\/ing\u00e9nierie et technologie\/g\u00e9nie de l\u0027environnement\/\u00e9nergie et combustibles\/\u00e9nergie renouvelable","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"fr","availableLanguages":"de,en,es,fr,it,pl","code":"\/23\/51\/355\/1059","title":"mod\u00e8le math\u00e9matique","displayCode":"\/sciences naturelles\/math\u00e9matiques\/math\u00e9matiques appliqu\u00e9es\/mod\u00e8le math\u00e9matique","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"fr","availableLanguages":"en","code":"CP","attributes":{"classification":"projectFundingSchemeCategory","type":"relatedProjectFundingSchemeCategory"}},{"language":"fr","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"Centrale de donn\u00e9es de la recherche RTD","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"availableLanguages":"de,en,es,fr,it,pl","rcn":"856","code":"FP7-ENERGY","frameworkProgramme":"FP7","pga":"FP7-ENERGY","title":"Programme sp\u00e9cifique \u0022Coop\u00e9ration\u0022: \u00c9nergie","shortTitle":"\u00c9nergie","parent":{"rcn":"846\/1401\/837","code":"FP7-COOPERATION\/EC\/FP7"},"archivedDate":"2024-06-12 00:00:00","relations":{"categories":[{"language":"fr","code":"legalbasis","title":"Base juridique","description":"Programme: Base juridique pour le financement de la recherche","displayCode":"\/Base juridique","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"fr","code":"editorial","title":"\u00c9ditorial CORDIS","description":"R\u00e9dig\u00e9 par CORDIS","displayCode":"\/\u00c9ditorial CORDIS","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedLegalBasis"}},{"availableLanguages":"en","rcn":"18472","code":"ENERGY.2013.7.1.1","frameworkProgramme":"FP7","parent":{"rcn":"10129\/10128\/10962\/856\/846\/1401\/837","code":"ENERGY-7.1\/ENERGY-7\/ENERGY\/FP7-ENERGY\/FP7-COOPERATION\/EC\/FP7"},"archivedDate":"2024-06-14 00:00:00","relations":{"categories":[{"language":"fr","code":"topic","title":"Th\u00e8me","description":"Programme: Partie du programme de travail de la Commission mettant en \u0153uvre la base juridique","displayCode":"\/Th\u00e8me","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"fr","code":"editorial","title":"\u00c9ditorial CORDIS","description":"R\u00e9dig\u00e9 par CORDIS","displayCode":"\/\u00c9ditorial CORDIS","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedTopic"}}]},"contenttype":"project","attributes":{"source":"editorial","type":"relatedProject"}},{"language":"any","availableLanguages":"en,any","uri":"\/docs\/news\/images\/2015-06\/20150629-1.jpg","mimetype":"image\/jpeg","size":"0","contenttype":"webItem","attributes":{"represents":"article","source":"editorial","type":"relatedImage"}}],"categories":[{"language":"fr","availableLanguages":"de,en,es,fr,it,pl","code":"news","title":"Actualit\u00e9s","description":"Article: actualit\u00e9s","displayCode":"\/Actualit\u00e9s","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"fr","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"\u00c9ditorial CORDIS","description":"R\u00e9dig\u00e9 par CORDIS","displayCode":"\/\u00c9ditorial CORDIS","attributes":{"classification":"source","type":"isProvidedBy"}}],"regions":[{"name":"Italie","rcn":"309758504","nutsCode":"IT","euCode":"IT","isoCode":"IT","attributes":{"source":"editorial","type":"relatedRegion"}}]},"modelVersion":"132","icaVersion":"20.0.0-48f81e07"}