{"contenttype":"article","language":"en","availableLanguages":"en","rcn":"125299","id":"125299-digitising-building-energy-renovation","title":"Digitising building energy renovation","teaser":"In a market where time, costs and disruption to people\u2019s lives are key drivers, the BERTIM project has looked to digital solutions and a prefabrication business model to help boost the market potential for energy-efficient renovation. Project coordinator Nagore Tellado explains how she hopes this approach will lead to greater innovation in the construction sector and, ultimately, more much-needed renovation of Europe\u2019s inefficient buildings.","description":"0","body":"\r\n    \u003Csection\u003E\r\n      \u003CsectionBody\u003EThe EC has funded many projects supporting its policies designed to increase the energy efficiency of buildings through their renovation, with varying degrees of success. All aim to reduce Co2 emissions, increase energy efficiency, help make buildings less reliant on fossil fuel energy and benefit the environment overall - but while the policies are in place and the research is being generously funded, the market for this type of renovation is just not keeping up. \r\n\r\nOne of the main reasons for this is that the cost of energy is relatively cheap, while to renovate a building is very expensive and also very intrusive for those living or working in it. If we want to renovate buildings on a large scale to meet the EC\u2019s ambitious targets and change this market situation, then we need cost-effective solutions available that are quick to install and keep to a minimum any intrusion on residents\u2019 lives.\r\n\r\nBERTIM is a project that may well have a chance in this difficult market. Having just completed its four-year effort, which was coordinated by Tecnalia, the project addressed these two essential elements the market is looking for. On the one hand it has developed a prefabricated solution which allows for cost-effective renovation that improves energy performance, air quality, aesthetics, comfort, and raises the value of the property while on the other hand, it ensures low intrusiveness during renovation works, while providing a clear indication of any return on investment the improvements will deliver.\r\n\r\nThere are two elements to BERTIM\u2019s approach. The manufacturing element of the solution is included in a holistic methodology for the renovation process, from data collecting to installation. Meanwhile, there is a systemic methodology that is based on a digital data flow in BIM that has been implemented in a bespoke software named RenoBIM. This helps constructors reduce renovation operation time, allows for customised mass production, and lowers the financial risk for investors.\r\n\r\n\u201cPut simply, for BERTIM, cost-effective solutions for building renovation have two drivers,\u201d says project coordinator Nagore Tellado from Tecnalia in Bilbao, Spain. \u201cFirstly, we have digitised the whole process of renovation and secondly, we have developed a system of using mass-manufactured prefabricated modules that speed up the whole process and, through a franchise business model, are fully scalable.\u201d  \r\n\r\nTellado is, however, quick to concede that initial investment costs for BERTIM\u2019s renovation package may still be a barrier to market. While compared to traditional renovation solutions, BERTIM reduces installation time by more than half, the prefabricated solution is still not cheaper than the traditional solution at the moment. \u201cOur solution still requires a lot of man effort if done on a small scale,\u201d she says. \u201cBut, if we are able to use these solutions in a large number of buildings, then an economy of scale will be reached and we will then start to see better returns on investment.\u201d\r\n\r\nThe BERTIM solutions are designed for larger buildings that need to be renovated very quickly, like those in city centres where work cannot take months due to the disruption that would cause. \u201cWe have a demo site in France, where we renovated one building in two and a half days,\u201d Tellado explains. \u201cWhile the work in the factory making the prefabricated elements for the renovation takes longer than it does for traditional renovation, the BERTIM solution is very quick to install at the site itself \u2013 and digitisation is key to being able to achieve this.\u201d\r\n\r\nThis article was written for Projects Magazine. You can find the full article at: http:\/\/www.projectsmagazine.eu.com\/current_issue\u003C\/sectionBody\u003E\r\n    \u003C\/section\u003E\r\n  ","username":"AmeliaBrice","contentCreationDate":"2019-06-04 12:11:26","contentUpdateDate":"2019-06-04 12:11:12","lastUpdateDate":"2026-10-21 13:33:21","archivedDate":"2023-04-13 00:00:00","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"ener","title":"Energy","displayCode":"\/Energy","attributes":{"classification":"applicationDomain","type":"isApplicableIn"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"news","title":"News","description":"Article: news","displayCode":"\/News","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"wire","title":"Wire","description":"WIRE is available for all registered users who can submit their own content","displayCode":"\/Wire","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"availableLanguages":"en","rcn":"1958643","legalName":"Insight Publishers","address":{"country":"UK"},"relations":{"regions":[{"name":"United Kingdom","rcn":"508725800","nutsCode":"UK","euCode":"UK","isoCode":"GB","attributes":{"type":"relatedRegion"}}]},"contenttype":"organization","attributes":{"source":"wire","type":"relatedOrganization"}},{"availableLanguages":"en","rcn":"196760","id":"636984","acronym":"BERTIM","teaser":"About 40% of the overall energy consumption in Europe is related to the building sector and represents about 1\/3 of Europe\u2019s CO2 emissions. The successful accomplishment of the emission reduction target by 2050, involves the need to increase the rate of retrofitting of the...","title":"Building energy renovation through timber prefabricated modules","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"project","title":"Project","description":"Project factsheets","displayCode":"\/Project","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/25\/75\/469","title":"manufacturing engineering","displayCode":"\/engineering and technology\/mechanical engineering\/manufacturing engineering","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/25\/67\/425\/1169","title":"renewable energy","displayCode":"\/engineering and technology\/environmental engineering\/energy and fuels\/renewable energy","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/25\/67\/11936537\/91827000","title":"climatic change mitigation","displayCode":"\/engineering and technology\/environmental engineering\/ecosystem-based management\/climatic change mitigation","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/25\/67\/39381296","title":"air pollution engineering","displayCode":"\/engineering and technology\/environmental engineering\/air pollution engineering","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/25\/77\/479\/1267\/1749","title":"sustainable building","displayCode":"\/engineering and technology\/civil engineering\/architecture engineering\/sustainable architecture\/sustainable building","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"en","code":"IA","title":"Innovation action","description":"Innovation action","displayCode":"\/Innovation action","attributes":{"classification":"projectFundingSchemeCategory","type":"relatedProjectFundingSchemeCategory"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"availableLanguages":"de,en,es,fr,it,pl","rcn":"664321","code":"H2020-EU.3.3.","frameworkProgramme":"H2020","pga":"H2020-EU.3.3.","title":"SOCIETAL CHALLENGES - Secure, clean and efficient energy","shortTitle":"Energy","parent":{"rcn":"664235\/664087\/664086","code":"H2020-EU.3.\/H2020-EC\/H2020"},"relations":{"categories":[{"language":"en","code":"legalbasis","title":"Legal Basis","description":"Programme: Legal basis for research funding","displayCode":"\/Legal Basis","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedLegalBasis","uniqueProgrammePart":"true"}},{"availableLanguages":"de,en,es,fr,it,pl","rcn":"664323","code":"H2020-EU.3.3.1.","frameworkProgramme":"H2020","pga":"H2020-EU.3.3.1.","title":"Reducing energy consumption and carbon foorpint by smart and sustainable use","shortTitle":"Reducing energy consumption and carbon footprint","parent":{"rcn":"664321\/664235\/664087\/664086","code":"H2020-EU.3.3.\/H2020-EU.3.\/H2020-EC\/H2020"},"relations":{"categories":[{"language":"en","code":"legalbasis","title":"Legal Basis","description":"Programme: Legal basis for research funding","displayCode":"\/Legal Basis","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedLegalBasis"}},{"availableLanguages":"en","rcn":"664680","code":"EE-01-2014","frameworkProgramme":"H2020","title":"Manufacturing of prefabricated modules for renovation of building","parent":{"rcn":"20200","code":"H2020-Topics"},"relations":{"categories":[{"language":"en","code":"topic","title":"Topic","description":"Programme: Part of the Commission work programme implementing legal basis","displayCode":"\/Topic","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}},{"language":"en","code":"31049232","title":"Renovation","displayCode":"\/Renovation","attributes":{"classification":"topicKeyword","type":"isAbout"}},{"language":"en","code":"31049223","title":"Energy efficient buildings","displayCode":"\/Energy efficient buildings","attributes":{"classification":"topicKeyword","type":"isAbout"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedTopic"}}]},"contenttype":"project","attributes":{"source":"wire","type":"relatedProject"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/wire\/images\/2019-06\/20190603-135101085.jpg","mimetype":"image\/jpeg","size":"100043","copyright":"\u00a9    BERTIM","contenttype":"webItem","attributes":{"represents":"article","source":"wire","type":"relatedImage"}}]},"modelVersion":"132","icaVersion":"20.0.0-48f81e07"}