{"contenttype":"article","language":"en","availableLanguages":"de,en,es,fr,it,pl","rcn":"151885","id":"151885-novel-methodologies-and-plans-for-europes-future-secure-and-sustainable-electricity-infrastru","title":"Novel methodologies and plans for Europe\u0027s future secure and sustainable electricity infrastructure","teaser":"An EU initiative developed a pan-European power transmission network, including possible highways, to meet European energy needs between 2020 and 2050.","body":"\u003Csection\u003E\u003CsectionBody\u003EThe rapid expansion of renewable electricity sources and demand-side management technologies in Europe is going to change the way transmission systems are designed and operated. Electricity should be transported over longer distances, across national borders, in order to connect renewable electricity production located far from the main European consumption areas. Active demand response services might also be controlled over large geographical areas, therefore involving many stakeholders under different regulatory regimes.\n\nThe EU-funded http:\/\/www.e-highway2050.eu\/ (E-HIGHWAY2050) (Modular development plan of the pan-European transmission system 2050) project set out to address this requirement for the development of a pan-European transmission network in line with the EU\u0027s 2020 energy goals.\n\nProject partners devised methodologies centred on five European power system scenarios. These methodologies serve as a basis for all future long-term network planning while meeting low-carbon economy targets for 2050.\n\nRelying on enhanced optimisation and advanced simulation tools, the scenario-based planning methodology takes into account the whole electricity supply chain. This includes all relevant technological, economic, and regulatory or socio-political dimensions that are required to develop efficient and sustainable grid architecture options that will meet future energy supply requirements. Scenarios on generation, storage capacities and consumption patterns were tackled with the assistance of transmission system operators, research institutes, universities, industry associations and non-governmental organisations.\n\nResults fed into a modular development plan that presents the architectural possibilities of the electricity transmission network by 2050. It highlights the electricity generation, demand and transmission technologies expected from 2020 on and for each successive decade. In addition, the plan specifies the necessary grid reinforcements for 2040 and 2050, provides a cost-benefit analysis for the grid, and a synthesis of the generation, demand and grid from today to 2050 for 43 countries.\n\nE-HIGHWAY2050 supported the planning of a pan-European transmission network, helping to ensure the reliable delivery of renewable electricity and EU-wide market integration.\u003C\/sectionBody\u003E\u003C\/section\u003E","keywords":"Electricity, power transmission, transmission systems, E-HIGHWAY2050, modular development plan","contentCreationDate":"2015-01-22 12:09:00","contentUpdateDate":"2016-10-28 15:41:38","lastUpdateDate":"2025-09-24 17:43:43","archivedDate":"2024-06-10 00:00:00","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"ener","title":"Energy","displayCode":"\/Energy","attributes":{"classification":"applicationDomain","type":"isApplicableIn"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"brief","title":"Result in Brief","description":"Article: Classic and enhanced","displayCode":"\/Result in Brief","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"availableLanguages":"en","rcn":"106279","id":"308908","acronym":"E-HIGHWAY2050","teaser":"Eight Transmission System Operators (BE, CZ, FR, DE, IT, PT, CH, PL) and ENTSO-E, together with 4 associations of technology manufacturers, and 16 RTD performers propose a 3-year R\u0026D project to develop and to apply a methodology for the long-term development of the Pan-Europe...","title":"Modular Development Plan of the Pan-European Transmission  System 2050","archivedDate":"2024-06-18 00:00:00","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"project","title":"Project","description":"Project factsheets","displayCode":"\/Project","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/29\/101\/559","title":"governance","displayCode":"\/social sciences\/sociology\/governance","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/25\/73\/451\/1209\/1705","title":"electric power transmission","displayCode":"\/engineering and technology\/electrical engineering, electronic engineering, information engineering\/electrical engineering\/power engineering\/electric power transmission","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"en","code":"CP","title":"Collaborative project (generic)","displayCode":"\/Collaborative project (generic)","attributes":{"classification":"projectFundingSchemeCategory","type":"relatedProjectFundingSchemeCategory"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"availableLanguages":"de,en,es,fr,it,pl","rcn":"856","code":"FP7-ENERGY","frameworkProgramme":"FP7","pga":"FP7-ENERGY","title":"Specific Programme \u0022Cooperation\u0022: Energy","shortTitle":"Energy","parent":{"rcn":"846\/1401\/837","code":"FP7-COOPERATION\/EC\/FP7"},"archivedDate":"2024-06-12 00:00:00","relations":{"categories":[{"language":"en","code":"legalbasis","title":"Legal Basis","description":"Programme: Legal basis for research funding","displayCode":"\/Legal Basis","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedLegalBasis"}},{"availableLanguages":"en","rcn":"18229","code":"ENERGY.2012.7.2.1","frameworkProgramme":"FP7","title":"Planning for European Electricity Highways to ensure the reliable delivery of renewable electricity and pan-European market integration","parent":{"rcn":"10130\/10128\/10962\/856\/846\/1401\/837","code":"ENERGY-7.2\/ENERGY-7\/ENERGY\/FP7-ENERGY\/FP7-COOPERATION\/EC\/FP7"},"archivedDate":"2024-06-14 00:00:00","relations":{"categories":[{"language":"en","code":"topic","title":"Topic","description":"Programme: Part of the Commission work programme implementing legal basis","displayCode":"\/Topic","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedTopic"}}]},"contenttype":"project","attributes":{"source":"editorial","type":"relatedProject"}},{"availableLanguages":"en","rcn":"183683","title":"Final Report Summary - E-HIGHWAY2050 (Modular Development Plan of the Pan-European Transmission  System 2050)","teaser":"The e-Highway2050 project is a collaborative research and demonstration project supported by the EU Seventh Framework Programme (Grant Agreement N\u00b0308908) and aimed at:-\tdeveloping a methodology to support the planning of the Pan-European Transmission...","contentUpdateDate":"2016-06-06 12:31:24","archivedDate":"2024-06-23 00:00:00","relations":{"categories":[{"language":"en","code":"pubsum","title":"Report Summary","description":"Result: Publishable summary (FP7 SESAM) and Summary for publication (H2020 SyGMa)","displayCode":"\/Report Summary","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","code":"sesam","title":"SESAM","description":"RTD FP7 reporting system (including FP6 Marie Curie)","displayCode":"\/SESAM","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"rcn":"106279","id":"308908","title":"Modular Development Plan of the Pan-European Transmission  System 2050","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"project","title":"Project","description":"Project factsheets","displayCode":"\/Project","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/29\/101\/559","title":"governance","displayCode":"\/social sciences\/sociology\/governance","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/25\/73\/451\/1209\/1705","title":"electric power transmission","displayCode":"\/engineering and technology\/electrical engineering, electronic engineering, information engineering\/electrical engineering\/power engineering\/electric power transmission","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"en","code":"CP","title":"Collaborative project (generic)","displayCode":"\/Collaborative project (generic)","attributes":{"classification":"projectFundingSchemeCategory","type":"relatedProjectFundingSchemeCategory"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"project","attributes":{"source":"sesam","type":"relatedProject"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/308\/308908\/final1-160329-e-highway2050-summary.pdf","mimetype":"application\/pdf","size":"95865","contenttype":"webItem","attributes":{"source":"sesam","type":"relatedResultAttachment"}}]},"contenttype":"result","attributes":{"source":"editorial","type":"relatedResult"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl,any","uri":"\/docs\/results\/images\/2016-10\/151885.jpg","mimetype":"image\/jpeg","size":"0","copyright":"\u00a9 averess, Thinkstock","contenttype":"webItem","attributes":{"represents":"article","source":"editorial","type":"relatedImage"}}],"regions":[{"name":"France","rcn":"258902568","nutsCode":"FR","euCode":"FR","isoCode":"FR","attributes":{"source":"editorial","type":"relatedRegion"}}]},"modelVersion":"132","icaVersion":"20.0.0-48f81e07"}