{"contenttype":"article","language":"en","availableLanguages":"de,en,es,fr,it,pl","rcn":"175128","id":"175128-a-step-forward-for-reconciling-trains-and-tracks-in-europe","title":"A step forward for reconciling trains and tracks in Europe","teaser":"Electromagnetic interference poses a major barrier to achieving rail interoperability across Europe. Harmonising rules and accelerating the certification process should help overcome this barrier.","body":"\u003Csection\u003E\u003CsectionBody\u003ELengthy and costly is the only way to describe the current authorisation process for bringing rail vehicles into service according to technical specifications for interoperability (TSI) and national safety rules. Electromagnetic compatibility (EMC) between rail vehicles and installed track circuits represents one of the major cost drivers in this process for putting new rolling stock on the tracks. Each country has its own rules and assessment procedures, which hinders true interoperability.\n\nThe http:\/\/www.euremco.eu\/ (EUREMCO) (European railway electromagnetic compatibility) project addressed the core issue of EMC. Closing some \u0027open points\u0027 in TSI related to EMC should lead to a time and cost reduction of rail vehicle certification processes.\n\nCurrently, there are no standards or procedures addressing the transient effects on track circuits. Sharing of operator and manufacturers\u0027 data on transients with the European community of experts formed a key part of project activities. This knowledge should help address how to handle those transients that affect data acquisition during certification tests. Work was carried out on the characteristics of transients that cause interference. Another activity was a modelling exercise that gives the transfer function from the train to the track circuit receiver and the effects of transients.\n\nTo validate the current TSI version for the 15\u00a0kV AC power supply system, three project partners (rail operators) carried out measurement campaigns in Austria, Germany and Switzerland. The measurements were taken using a locomotive with different capacitive input impedances for simulating roof cables with different lengths.\n\nProject partners achieved significant progress in defining and proposing European-wide cross-accepted test tracks for the 25\u00a0kV AC and DC power supply systems. Results should help facilitate certification in all countries using such electrification systems.\n\nEUREMCO partners also provided a recommendation to help prevent rolling stock from interfering with track circuits on non-electrified lines. EMC measurements successfully proved the consistency of this recommendation.\n\nOnce Europe reaches common understanding on transients and sets interference emission limits, it should be possible to use the results obtained in one country to authorise the operation of a vehicle in another.\u003C\/sectionBody\u003E\u003C\/section\u003E","keywords":"Trains, rail interoperability, certification, electromagnetic compatibility, track circuits, transients","contentCreationDate":"2016-02-10 12:42:43","contentUpdateDate":"2016-02-10 12:42:32","lastUpdateDate":"2025-09-17 22:37:00","archivedDate":"2024-06-10 00:00:00","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"indust","title":"Industrial Technologies","displayCode":"\/Industrial Technologies","attributes":{"classification":"applicationDomain","type":"isApplicableIn"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"brief","title":"Result in Brief","description":"Article: Classic and enhanced","displayCode":"\/Result in Brief","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"availableLanguages":"en","rcn":"100605","id":"285082","acronym":"EUREMCO","teaser":"The current authorisation process for placing into service rail vehicles according to Technical Specifications for Interoperability and national safety rules is a very long and costly process. The Technical Specifications for Interoperability (TSI) provide common regulations ...","title":"European Railway Electromagnetic Compatibility","archivedDate":"2024-06-18 00:00:00","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"project","title":"Project","description":"Project factsheets","displayCode":"\/Project","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"en","code":"CP-FP","title":"Small or medium-scale focused research project","displayCode":"\/Small or medium-scale focused research project","attributes":{"classification":"projectFundingSchemeCategory","type":"relatedProjectFundingSchemeCategory"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"availableLanguages":"de,en,es,fr,it,pl","rcn":"857","code":"FP7-TRANSPORT","frameworkProgramme":"FP7","pga":"FP7-TRANSPORT","title":"Specific Programme \u0022Cooperation\u0022: Transport (including Aeronautics)","shortTitle":"Transport(including Aeronautics)","parent":{"rcn":"846\/1401\/837","code":"FP7-COOPERATION\/EC\/FP7"},"archivedDate":"2024-06-12 00:00:00","relations":{"categories":[{"language":"en","code":"legalbasis","title":"Legal Basis","description":"Programme: Legal basis for research funding","displayCode":"\/Legal Basis","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedLegalBasis"}},{"availableLanguages":"en","rcn":"15397","code":"SST.2011.2.5-1.","frameworkProgramme":"FP7","title":"Rail system interoperability (regulatory and non-legislative interoperability based on technological innovations","parent":{"rcn":"10437\/10432\/16100\/13451\/857\/846\/1401\/837","code":"SST-2.5\/SST-2\/SST\/TPT\/FP7-TRANSPORT\/FP7-COOPERATION\/EC\/FP7"},"archivedDate":"2024-06-14 00:00:00","relations":{"categories":[{"language":"en","code":"topic","title":"Topic","description":"Programme: Part of the Commission work programme implementing legal basis","displayCode":"\/Topic","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedTopic"}}]},"contenttype":"project","attributes":{"source":"editorial","type":"relatedProject"}},{"availableLanguages":"en","rcn":"169149","title":"Final Report Summary - EUREMCO (European Railway Electromagnetic Compatibility)","teaser":"The EUREMCO overall objective was to promote interoperable rail traffic by harmonising and reducing the certification process of rail vehicle against Electromagnetic Compatibility (EMC). The main concept of the project was to specify the conditions for...","contentUpdateDate":"2015-08-19 15:37:36","archivedDate":"2024-06-23 00:00:00","relations":{"categories":[{"language":"en","code":"pubsum","title":"Report Summary","description":"Result: Publishable summary (FP7 SESAM) and Summary for publication (H2020 SyGMa)","displayCode":"\/Report Summary","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","code":"sesam","title":"SESAM","description":"RTD FP7 reporting system (including FP6 Marie Curie)","displayCode":"\/SESAM","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"rcn":"100605","id":"285082","title":"European Railway Electromagnetic Compatibility","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"project","title":"Project","description":"Project factsheets","displayCode":"\/Project","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"en","code":"CP-FP","title":"Small or medium-scale focused research project","displayCode":"\/Small or medium-scale focused research project","attributes":{"classification":"projectFundingSchemeCategory","type":"relatedProjectFundingSchemeCategory"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"project","attributes":{"source":"sesam","type":"relatedProject"}}]},"contenttype":"result","attributes":{"source":"editorial","type":"relatedResult"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl,any","uri":"\/docs\/results\/images\/2016-02\/169149.jpg","mimetype":"image\/jpeg","size":"0","copyright":"\u00a9 Thinkstock","contenttype":"webItem","attributes":{"represents":"article","source":"editorial","type":"relatedImage"}}],"regions":[{"name":"Belgium","rcn":"188385832","nutsCode":"BE","euCode":"BE","isoCode":"BE","attributes":{"source":"editorial","type":"relatedRegion"}}]},"modelVersion":"132","icaVersion":"19.1.0-ea6a1f3f"}