{"contenttype":"article","language":"en","availableLanguages":"de,en,es,fr,it,pl","rcn":"86422","id":"86422-smart-solutions-for-europes-integrated-power-grid","title":"Smart solutions for Europe\u0027s integrated power grid","teaser":"The EU plans to complete its ambitious single market in energy by 2014. A European research project has come up with advanced algorithms and models to help network operators manage the cross-border flow of electricity efficiently, reliably and sustainably.","body":"\u003Csection\u003E\u003CsectionBody\u003EMany years ago, electricity was a monopoly operated at the national level. In recent years, the European grid has moved in two directions: it has integrated across borders and there is a growing amount of decentralised power generation, such as locally produced wind and solar power. Any surplus from this feeds into the grid.\n\nIn recent years, the EU has been striving to build an integrated single European energy market for gas and electricity, which should be completed by 2014. The European Network of Transmission System Operators for Electricity (ENTSO-E) was created to enable Europe\u0027s transmission system operators to coordinate and manage their cross-border electricity supplies. The network aims to underwrite the security, adequacy, reliability and sustainability of Europe\u0027s electricity supply.\n\nWith financing from the Seventh Framework Programme (FP7), the \u0027Pan-European grid advanced simulation and state estimation\u0027 (PEGASE) project is working to boost the efficiency of the pan-European electricity network by creating better algorithms for the monitoring, simulation and optimisation of very large power systems.\n\nWith 22 partners from across the EU, the four-year project has developed and tested prototype algorithms and smart tools for managing the European grid. These include real-time estimation of the state of the network and automated steady-state optimisation based on actual operating conditions.\n\nIn addition, PEGASE has developed models for simulating the complex dynamic processes in the network to ensure stability and to prevent blackouts. Project members also trained the dispatchers to avoid potentially problematic human errors during stressful on\u2013the\u2013spot decisions.\n\nPEGASE is helping to pave the way towards a more efficient, reliable and sustainable European grid by removing the technical algorithmic barriers that prevent the optimisation and simulation of very large systems.\u003C\/sectionBody\u003E\u003C\/section\u003E","contentCreationDate":"2011-03-29 10:00:27","contentUpdateDate":"2011-03-29 10:00:27","lastUpdateDate":"2018-10-08 16:13:17","archivedDate":"2024-06-10 00:00:00","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"ener","title":"Energy","displayCode":"\/Energy","attributes":{"classification":"applicationDomain","type":"isApplicableIn"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"brief","title":"Result in Brief","description":"Article: Classic and enhanced","displayCode":"\/Result in Brief","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"availableLanguages":"de,en,es,fr,it,pl","rcn":"400708","id":"400708-infectious-diseases-international-leadership-tackling-major-health-concerns","title":"Infectious diseases: international leadership tackling major health concerns","contentUpdateDate":"2011-11-01 00:00:01","archivedDate":"2024-05-29 00:00:00","relations":{"categories":[{"language":"en","code":"mag","title":"research*eu magazine","description":"Article: Both results and focus magazines","displayCode":"\/research*eu magazine","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl,any","uri":"\/docs\/article\/images\/2017-10\/400708.jpg","mimetype":"image\/jpeg","size":"0","contenttype":"webItem","attributes":{"represents":"magazineCover","source":"editorial","type":"relatedImage"}},{"language":"en","availableLanguages":"en","defaultLanguage":"en","title":"Download ePUB version","id":"f451439e-9e5c-4d9e-8e19-0fdd0caed45e_epub","physUrl":"https:\/\/op.europa.eu\/o\/opportal-service\/download-handler?identifier=f451439e-9e5c-4d9e-8e19-0fdd0caed45e\u0026format=EPUB\u0026language=en\u0026productionSystem=cellar","status":"legacy","contenttype":"webLink","attributes":{"represents":"article","source":"editorial","type":"formatEpub"}},{"language":"en","availableLanguages":"en","defaultLanguage":"en","title":"Download PDF version","id":"f451439e-9e5c-4d9e-8e19-0fdd0caed45e_pdf","physUrl":"https:\/\/op.europa.eu\/o\/opportal-service\/download-handler?identifier=f451439e-9e5c-4d9e-8e19-0fdd0caed45e\u0026format=PDF\u0026language=en\u0026productionSystem=cellar","status":"legacy","contenttype":"webLink","attributes":{"represents":"article","source":"editorial","type":"formatPdf"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","defaultLanguage":"en","title":"Order paper copy","id":"f451439e-9e5c-4d9e-8e19-0fdd0caed45e_print","physUrl":"https:\/\/op.europa.eu\/en\/publication-detail\/-\/publication\/f451439e-9e5c-4d9e-8e19-0fdd0caed45e\/","status":"legacy","contenttype":"webLink","attributes":{"represents":"article","source":"editorial","type":"orderPrint"}}]},"contenttype":"article","attributes":{"source":"editorial","type":"isContainedIn"}},{"availableLanguages":"en","rcn":"88387","id":"211407","acronym":"PEGASE","teaser":"PEGASE is a four year project dealing with the High and Extra High Voltage transmission and sub-transmission networks in Europe (designated as ETN) and implemented by a Consortium composed of 20 Partners including TSOs, expert companies and leading research centre\u2019s in power ...","title":"Pan European Grid Advanced Simulation and state Estimation","archivedDate":"2024-06-18 00:00:00","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"project","title":"Project","description":"Project factsheets","displayCode":"\/Project","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/23\/47\/307","title":"software","displayCode":"\/natural sciences\/computer and information sciences\/software","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/23\/51","title":"mathematics","displayCode":"\/natural sciences\/mathematics","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"en","code":"CP-IP","title":"Large-scale integrating project","displayCode":"\/Large-scale integrating project","attributes":{"classification":"projectFundingSchemeCategory","type":"relatedProjectFundingSchemeCategory"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"availableLanguages":"de,en,es,fr,it,pl","rcn":"856","code":"FP7-ENERGY","frameworkProgramme":"FP7","pga":"FP7-ENERGY","title":"Specific Programme \u0022Cooperation\u0022: Energy","shortTitle":"Energy","parent":{"rcn":"846\/1401\/837","code":"FP7-COOPERATION\/EC\/FP7"},"archivedDate":"2024-06-12 00:00:00","relations":{"categories":[{"language":"en","code":"legalbasis","title":"Legal Basis","description":"Programme: Legal basis for research funding","displayCode":"\/Legal Basis","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedLegalBasis"}},{"availableLanguages":"en","rcn":"11678","code":"ENERGY-2007-7.2-01","frameworkProgramme":"FP7","title":"Simulation and state estimation of smart electricity transmission networks","parent":{"rcn":"10130\/10128\/10962\/856\/846\/1401\/837","code":"ENERGY-7.2\/ENERGY-7\/ENERGY\/FP7-ENERGY\/FP7-COOPERATION\/EC\/FP7"},"archivedDate":"2024-06-14 00:00:00","relations":{"categories":[{"language":"en","code":"topic","title":"Topic","description":"Programme: Part of the Commission work programme implementing legal basis","displayCode":"\/Topic","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedTopic"}}]},"contenttype":"project","attributes":{"source":"editorial","type":"relatedProject"}},{"availableLanguages":"en","rcn":"235933","title":"Final Report Summary - PEGASE (Pan European Grid Advanced Simulation and state Estimation)","teaser":"As a consequence, the organization of the operation of the ETN must adapt and become much more integrated and smart. The way the ETN operation was decoupled into national grids is far away. The ETN shall be, and already is, operated much closer to...","contentUpdateDate":"2018-07-13 16:18:24","archivedDate":"2024-06-23 00:00:00","relations":{"categories":[{"language":"en","code":"pubsum","title":"Report Summary","description":"Result: Publishable summary (FP7 SESAM) and Summary for publication (H2020 SyGMa)","displayCode":"\/Report Summary","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","code":"sesam","title":"SESAM","description":"RTD FP7 reporting system (including FP6 Marie Curie)","displayCode":"\/SESAM","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"rcn":"88387","id":"211407","title":"Pan European Grid Advanced Simulation and state Estimation","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"project","title":"Project","description":"Project factsheets","displayCode":"\/Project","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/23\/47\/307","title":"software","displayCode":"\/natural sciences\/computer and information sciences\/software","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/23\/51","title":"mathematics","displayCode":"\/natural sciences\/mathematics","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"en","code":"CP-IP","title":"Large-scale integrating project","displayCode":"\/Large-scale integrating project","attributes":{"classification":"projectFundingSchemeCategory","type":"relatedProjectFundingSchemeCategory"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"project","attributes":{"source":"sesam","type":"relatedProject"}},{"language":"any","availableLanguages":"any","uri":"\/docs\/results\/211\/211407\/final1-key-results-175x245-bd-3.pdf","mimetype":"application\/pdf","size":"0","contenttype":"webItem","attributes":{"source":"sesam","type":"relatedResultAttachment"}}]},"contenttype":"result","attributes":{"source":"editorial","type":"relatedResult"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl,any","uri":"\/docs\/results\/images\/2011-03\/56950.jpg","mimetype":"image\/jpeg","size":"49182","copyright":"\u00a9 Thinkstock","contenttype":"webItem","attributes":{"represents":"article","source":"editorial","type":"relatedImage"}}],"regions":[{"name":"Belgium","rcn":"188385832","nutsCode":"BE","euCode":"BE","isoCode":"BE","attributes":{"source":"editorial","type":"relatedRegion"}}]},"modelVersion":"132","icaVersion":"20.0.0-48f81e07"}