Skip to main content
European Commission logo print header

Simulation Enhanced Integrated Systems for Model-based Intelligent Control(s)

Objective

EINSTEIN addresses the scientific and technical challenges related to the optimization of energy efficiency in existing buildings. This is achieved through the development of a new innovative modular simulation-based building control system. This has the ability to: (i) exploit real-time holistic building simulation (integrated with diverse building systems), (ii) directly enable automated control actions of a building and its surroundings (adaptively) and (iii) provide considerable energy savings to the building (by an optimized algorithm). EINSTEIN will formulate and integrate a number of new control strategies to be used with the simulation-based building control system to provide the building manager with the optimum energy efficiency solutions for their building and its use by its occupants. It will not only eradicate errors between ‘as-built’ and ‘as-designed’ conditions but also include predictive analysis with respect to how the building will perform, taking into account future weather predictions and occupant use. The control strategies will be tested and validated on a number of existing buildings

Call for proposal

FP7-PEOPLE-2013-IAPP
See other projects for this call

Coordinator

INTEGRATED ENVIRONMENTAL SOLUTIONS LIMITED
EU contribution
€ 338 002,72
Address
KELVIN CAMPUS WEST OF SCOTLAND SCIENCE PARK HELIX BUILDING
G20 0SP Glasgow
United Kingdom

See on map

Region
Scotland West Central Scotland Glasgow City
Activity type
Private for-profit entities (excluding Higher or Secondary Education Establishments)
Administrative Contact
Ruth Kerrigan (Dr.)
Links
Total cost
No data

Participants (1)