{"contenttype":"project","language":"en","availableLanguages":"en","rcn":"197175","id":"674741","acronym":"ELISA","teaser":"The offshore wind market is a young and rapidly growing market, whose current project pipeline for 2025\/30 would equal nearly 80 nuclear plants, mostly in Europe. The next decade and beyond may average 1,000 offshore towers\/year worldwide, with an overall investment volume...","objective":"The offshore wind market is a young and rapidly growing market, whose current project pipeline for 2025\/30 would equal nearly 80 nuclear plants, mostly in Europe. The next decade and beyond may average 1,000 offshore towers\/year worldwide, with an overall investment volume around 15-20.000 M\u20ac\/year. \n\nThis growing sector faces technological challenges, as it is set to move into deeper waters further offshore while being able to reduce the costs in order to reach a competitive LCOE (levelised cost of energy). For water depths above 40m (70% of the future market) approximately 40-50% of investment corresponds to the substructure (foundation and tower). Therefore a significant cost reduction in foundation\/tower would drastically improve the overall cost of offshore wind energy. \n\nThis project intends to develop and demonstrate in operative environment a full scale prototype of a revolutionary substructure system for offshore wind turbines. The concept consists in a self-installing precast concrete telescopic tower which for the first time ever shall allow for crane-free offshore installation of foundations, towers and turbines, thus overcoming the constraints imposed by the dependence on offshore heavy-lift vessels. It will allow for a full in-shore preassembly of the complete system, which is key to generate a highly industrialized manufacturing process with high production rates and optimized risk control. The main benefits expected are:\n\u2022 30-40% cost reduction (both CAPEX and OPEX).\n\u2022 Large water depth applicability range for deep offshore (\u003E45m water depth). \n\u2022 Supports increased turbine size (5-8MW).\n\u2022 Allows for large scale fast industrial deployment of foundations.\n\u2022 Reduces dependence on costly and scarce installation vessels.\n\u2022 Improved asset integrity (durability) \n\nThis solution will imply a radical step forward for cost-effective and industrially deployable deep offshore wind.","title":"SELF-BOUYANT PRECAST CONCRETE FOUNDATION FOR THE CRANELESS INSTALLATION OF COMPLETE OFFSHORE WIND TURBINES: FULL SCALE OFFSHORE PROTOTYPE","keywords":"Off-shore wind energy, craneless installation","totalCost":"3575441.46","ecMaxContribution":"2497862.5","startDate":"2015-06-01","endDate":"2017-05-31","ecSignatureDate":"2015-06-01","duration":"24","status":"CLOSED","identifiers":{"grantDoi":"10.3030\/674741"},"validation":{"euroSciVoc":"false"},"sourceUpdateDate":"2019-06-24 03:09:28","contentCreationDate":"2015-06-03 17:41:07","contentUpdateDate":"2023-10-03 17:26:54","lastUpdateDate":"2026-10-23 10:36:04","relations":{"associations":[{"availableLanguages":"de,en,es,fr,it,pl","rcn":"216397","id":"216397-introducing-the-selffloating-foundations-of-offshore-power","title":"Introducing the self-floating foundations of offshore power","teaser":"Offshore wind power has huge potential, but installing the turbines is a challenge. SME Esteyco, through EU funding, have developed a self-floating concrete foundation that reduces construction and installation costs.","contentUpdateDate":"2018-01-22 12:24:30","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"ener","title":"Energy","displayCode":"\/Energy","attributes":{"classification":"applicationDomain","type":"isApplicableIn"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"brief","title":"Result in Brief","description":"Article: Classic and enhanced","displayCode":"\/Result in Brief","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl,any","uri":"\/docs\/results\/images\/2018-01\/216397.jpg","mimetype":"image\/jpeg","size":"0","copyright":"\u00a9 lightrain, Shutterstock","contenttype":"webItem","attributes":{"represents":"article","source":"editorial","type":"relatedImage"}}]},"contenttype":"article","attributes":{"source":"editorial","type":"relatedArticle"}},{"availableLanguages":"en","rcn":"125656","id":"125656-elisa-project-to-construct-a-fullscale-offshore-prototype-in-the-canary-islands-after-approva","title":"ELISA Project to construct a full-scale off-shore prototype in the Canary Islands after approval by the H2020 Programme through the SME Instrument","teaser":"In March 2015 the European Commission, through its H2020 SME Instrument programme, provided the ELISA project with funding to cover part of the costs for the construction of a full-scale prototype of off-shore substructure and wind tower in Gran Canaria, recognizing Esteyco as one of the most innovative companies in the European scene in solutions to reduce the cost of energy. ","contentUpdateDate":"2016-03-14 14:48:58","archivedDate":"2023-03-24 00:00:00","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"news","title":"News","description":"Article: news","displayCode":"\/News","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"wire","title":"Wire","description":"WIRE is available for all registered users who can submit their own content","displayCode":"\/Wire","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"article","attributes":{"source":"wire","type":"relatedArticle"}},{"availableLanguages":"de,en,es,fr,it,pl","rcn":"120526","id":"120526-introducing-the-selfinstalling-offshore-wind-turbine","title":"Introducing the self-installing offshore wind turbine","teaser":"Researchers have developed an offshore wind turbine system that can be completely pre-assembled and pre-commissioned in controlled harbour conditions.","contentUpdateDate":"2016-10-17 12:58:25","archivedDate":"2023-03-24 00:00:00","relations":{"associations":[{"availableLanguages":"de,en,es,fr,it,pl","rcn":"400792","title":"Shaping the future of offshore wind","archivedDate":"2024-05-29 00:00:00","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"mag","title":"research*eu magazine","description":"Article: Both results and focus magazines","displayCode":"\/research*eu magazine","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"article","attributes":{"source":"editorial","type":"isContainedIn"}},{"availableLanguages":"de,en,es,fr,it,pl","rcn":"24805","title":"R\u0026D investment for renewable energy technologies will ensure sustainable energy mix for Europe","archivedDate":"2023-03-01 00:00:00","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"news","title":"News","description":"Article: news","displayCode":"\/News","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"policyMaking","title":"Policy making and guidelines","displayCode":"\/Policy making and guidelines","attributes":{"classification":"nature","type":"groupedBy"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"article","attributes":{"source":"editorial","type":"relatedArticle"}},{"availableLanguages":"de,en,es,fr,it,pl","rcn":"124232","title":"World\u2019s first telescopic wind turbine installed in the Canary Islands","archivedDate":"2023-04-12 00:00:00","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"env","title":"Climate Change and Environment","displayCode":"\/Climate Change and Environment","attributes":{"classification":"applicationDomain","type":"isApplicableIn"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"ener","title":"Energy","displayCode":"\/Energy","attributes":{"classification":"applicationDomain","type":"isApplicableIn"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"news","title":"News","description":"Article: news","displayCode":"\/News","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"scientificAdvances","title":"Scientific advances","displayCode":"\/Scientific advances","attributes":{"classification":"nature","type":"groupedBy"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"article","attributes":{"source":"editorial","type":"relatedArticle"}},{"availableLanguages":"de,en,es,fr,it,pl","rcn":"118743","title":"Long-lasting coatings for offshore renewable energy","archivedDate":"2023-03-24 00:00:00","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"news","title":"News","description":"Article: news","displayCode":"\/News","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"newProducts","title":"New products and technologies","displayCode":"\/New products and technologies","attributes":{"classification":"nature","type":"groupedBy"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"article","attributes":{"source":"editorial","type":"relatedArticle"}},{"availableLanguages":"de,en,es,fr,it,pl","rcn":"442611","title":"Online monitoring technology for safer and more cost-efficient mooring operations","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"ener","title":"Energy","displayCode":"\/Energy","attributes":{"classification":"applicationDomain","type":"isApplicableIn"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"news","title":"News","description":"Article: news","displayCode":"\/News","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"scientificAdvances","title":"Scientific advances","displayCode":"\/Scientific advances","attributes":{"classification":"nature","type":"groupedBy"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"article","attributes":{"source":"editorial","type":"relatedArticle"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl,any","uri":"\/docs\/news\/images\/2016-10\/20161017-1.jpg","mimetype":"image\/jpeg","size":"0","copyright":"\u00a9 ELISA","contenttype":"webItem","attributes":{"represents":"article","source":"editorial","type":"relatedImage"}}],"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"news","title":"News","description":"Article: news","displayCode":"\/News","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"newProducts","title":"New products and technologies","displayCode":"\/New products and technologies","attributes":{"classification":"nature","type":"groupedBy"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"article","attributes":{"source":"wire","type":"relatedArticle"}},{"rcn":"235","title":"H2020-SMEINST-2-2014","identifier":"H2020-SMEINST-2-2014","contenttype":"call","attributes":{"source":"corda","type":"relatedSubCall"}},{"rcn":"53727","title":"H2020-SMEInst-2014-2015","identifier":"H2020-SMEInst-2014-2015","contenttype":"call","attributes":{"source":"corda","type":"relatedMasterCall"}},{"availableLanguages":"en","rcn":"2372956","id":"935928169","vatNumber":"ESA28344083","legalName":"ESTEYCO SA","shortName":"ESTEYCO","address":{"street":"CALLE MENENDEZ PIDAL 17","city":"Madrid","postalCode":"28036","country":"ES","geolocation":"40.461439467,-3.681862701"},"relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"PRC","title":"Private for-profit entities (excluding Higher or Secondary Education Establishments)","displayCode":"\/Private for-profit entities (excluding Higher or Secondary Education Establishments)","attributes":{"classification":"organizationActivityType","type":"relatedOrganizationActivityType"}}],"regions":[{"name":"Madrid","rcn":"242233344","nutsCode":"ES300","parents":{"name":"Comunidad de Madrid\/Comunidad de Madrid\/Spain","rcn":"242233384\/242235944\/242387496","nutsCode":"ES30\/ES3\/ES","euCode":"ES","isoCode":"ES"},"attributes":{"type":"relatedNutsCode"}},{"name":"Spain","rcn":"242387496","nutsCode":"ES","euCode":"ES","isoCode":"ES","attributes":{"type":"relatedRegion"}}]},"contenttype":"organization","attributes":{"ecContribution":"2497862.5","sme":"true","source":"corda","type":"coordinator","netEcContribution":"2497862.5","terminated":"false","totalCost":"3575441.46","order":"1"}},{"availableLanguages":"de,en,es,fr,it,pl","rcn":"664321","id":"H2020-EU.3.3.","code":"H2020-EU.3.3.","frameworkProgramme":"H2020","pga":"H2020-EU.3.3.","title":"SOCIETAL CHALLENGES - Secure, clean and efficient energy","shortTitle":"Energy","parent":{"rcn":"664235\/664087\/664086","code":"H2020-EU.3.\/H2020-EC\/H2020"},"relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"legalbasis","title":"Legal Basis","description":"Programme: Legal basis for research funding","displayCode":"\/Legal Basis","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedLegalBasis","uniqueProgrammePart":"true"}},{"availableLanguages":"en","rcn":"664880","id":"H2020_SIE-01-2014","code":"SIE-01-2014","frameworkProgramme":"H2020","title":"Stimulating the innovation potential of SMEs for a low carbon energy system","parent":{"rcn":"20200","code":"H2020-Topics"},"relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"topic","title":"Topic","description":"Programme: Part of the Commission work programme implementing legal basis","displayCode":"\/Topic","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}},{"language":"en","availableLanguages":"en","code":"31049222","title":"Energy efficiency - general","displayCode":"\/Energy efficiency - general","attributes":{"classification":"topicKeyword","type":"isAbout"}},{"language":"en","availableLanguages":"en","code":"31049352","title":"Sustainable energy communities","displayCode":"\/Sustainable energy communities","attributes":{"classification":"topicKeyword","type":"isAbout"}},{"language":"en","availableLanguages":"en","code":"31049388","title":"Fossil fuels","displayCode":"\/Fossil fuels","attributes":{"classification":"topicKeyword","type":"isAbout"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedTopic"}},{"availableLanguages":"de,en,es,fr,it,pl","rcn":"664225","id":"H2020-EU.2.3.1.","code":"H2020-EU.2.3.1.","frameworkProgramme":"H2020","pga":"H2020-EU.2.3.1.","title":" Mainstreaming SME support, especially through a dedicated instrument","shortTitle":"Mainstreaming SME support","parent":{"rcn":"664223\/664143\/664087\/664086","code":"H2020-EU.2.3.\/H2020-EU.2.\/H2020-EC\/H2020"},"relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"legalbasis","title":"Legal Basis","description":"Programme: Legal basis for research funding","displayCode":"\/Legal Basis","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedLegalBasis"}},{"availableLanguages":"en","rcn":"1479715","id":"674741_9C3A7C6E42B444A164BEE7C24C6681EE_IPR","title":"Sistema flotante auxiliar para la instalaci\u00f3n y\/o el transporte de estructuras marinas y procedimiento que comprende dicho sistema","details":"\r\n    \u003CiprAwarded \/\u003E\r\n    \u003CiprDate\u003E2016-05-13\u003C\/iprDate\u003E\r\n    \u003CiprNumber\u003E201630627\u003C\/iprNumber\u003E\r\n    \u003CiprPrefix\u003EES\u003C\/iprPrefix\u003E\r\n  ","sourceUpdateDate":"2026-10-19 16:02:43","contentUpdateDate":"2026-10-23 10:36:00","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"ipr","title":"Intellectual Property Rights","description":"Result: Intellectual property rights linked to the results of EU funded research (FP7 onwards)","displayCode":"\/Intellectual Property Rights","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"PATENT","title":"Patent","displayCode":"\/Patent","attributes":{"classification":"iprType","type":"isRegisteredAs"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"availableLanguages":"en","rcn":"2372956","id":"935928169","vatNumber":"ESA28344083","legalName":"ESTEYCO SA","shortName":"ESTEYCO","address":{"street":"CALLE MENENDEZ PIDAL 17","city":"Madrid","postalCode":"28036","country":"ES","geolocation":"40.461439467,-3.681862701"},"relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"PRC","title":"Private for-profit entities (excluding Higher or Secondary Education Establishments)","displayCode":"\/Private for-profit entities (excluding Higher or Secondary Education Establishments)","attributes":{"classification":"organizationActivityType","type":"relatedOrganizationActivityType"}}],"regions":[{"name":"Madrid","rcn":"242233344","nutsCode":"ES300","parents":{"name":"Comunidad de Madrid\/Comunidad de Madrid\/Spain","rcn":"242233384\/242235944\/242387496","nutsCode":"ES30\/ES3\/ES","euCode":"ES","isoCode":"ES"},"attributes":{"type":"relatedNutsCode"}},{"name":"Spain","rcn":"242387496","nutsCode":"ES","euCode":"ES","isoCode":"ES","attributes":{"type":"relatedRegion"}}]},"contenttype":"organization","attributes":{"source":"corda","type":"isRegisteredBy"}}]},"contenttype":"result","attributes":{"source":"corda","type":"relatedResult"}},{"availableLanguages":"en","rcn":"1479719","id":"674741_1CEF6977CDCFABAD66A27DEB11D8FE4F_IPR","title":"ASSEMBLY PROCESS OF A TELESCOPIC TOWER","details":"\r\n    \u003CiprAwarded\u003EEP\u003C\/iprAwarded\u003E\r\n    \u003CiprDate\u003E2012-12-10\u003C\/iprDate\u003E\r\n    \u003CiprNumber\u003E12813291\u003C\/iprNumber\u003E\r\n    \u003CiprPrefix\u003EEP\u003C\/iprPrefix\u003E\r\n  ","sourceUpdateDate":"2026-10-19 16:02:43","contentUpdateDate":"2026-10-23 10:36:00","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"ipr","title":"Intellectual Property Rights","description":"Result: Intellectual property rights linked to the results of EU funded research (FP7 onwards)","displayCode":"\/Intellectual Property Rights","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"PATENT","title":"Patent","displayCode":"\/Patent","attributes":{"classification":"iprType","type":"isRegisteredAs"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"availableLanguages":"en","rcn":"2372956","id":"935928169","vatNumber":"ESA28344083","legalName":"ESTEYCO SA","shortName":"ESTEYCO","address":{"street":"CALLE MENENDEZ PIDAL 17","city":"Madrid","postalCode":"28036","country":"ES","geolocation":"40.461439467,-3.681862701"},"relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"PRC","title":"Private for-profit entities (excluding Higher or Secondary Education Establishments)","displayCode":"\/Private for-profit entities (excluding Higher or Secondary Education Establishments)","attributes":{"classification":"organizationActivityType","type":"relatedOrganizationActivityType"}}],"regions":[{"name":"Madrid","rcn":"242233344","nutsCode":"ES300","parents":{"name":"Comunidad de Madrid\/Comunidad de Madrid\/Spain","rcn":"242233384\/242235944\/242387496","nutsCode":"ES30\/ES3\/ES","euCode":"ES","isoCode":"ES"},"attributes":{"type":"relatedNutsCode"}},{"name":"Spain","rcn":"242387496","nutsCode":"ES","euCode":"ES","isoCode":"ES","attributes":{"type":"relatedRegion"}}]},"contenttype":"organization","attributes":{"source":"corda","type":"isRegisteredBy"}}]},"contenttype":"result","attributes":{"source":"corda","type":"relatedResult"}},{"availableLanguages":"en","rcn":"1479726","id":"674741_C4C1CC0D1777A53FAEEB4EBBFF0B117B_IPR","title":"Dispositivo de guiado para montaje de torres e\u00f3licas","details":"\r\n    \u003CiprAwarded \/\u003E\r\n    \u003CiprDate\u003E2015-09-23\u003C\/iprDate\u003E\r\n    \u003CiprNumber\u003E201531355\u003C\/iprNumber\u003E\r\n    \u003CiprPrefix\u003EES\u003C\/iprPrefix\u003E\r\n  ","sourceUpdateDate":"2026-10-19 16:02:43","contentUpdateDate":"2026-10-23 10:36:00","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"ipr","title":"Intellectual Property Rights","description":"Result: Intellectual property rights linked to the results of EU funded research (FP7 onwards)","displayCode":"\/Intellectual Property Rights","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"PATENT","title":"Patent","displayCode":"\/Patent","attributes":{"classification":"iprType","type":"isRegisteredAs"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"availableLanguages":"en","rcn":"2372956","id":"935928169","vatNumber":"ESA28344083","legalName":"ESTEYCO SA","shortName":"ESTEYCO","address":{"street":"CALLE MENENDEZ PIDAL 17","city":"Madrid","postalCode":"28036","country":"ES","geolocation":"40.461439467,-3.681862701"},"relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"PRC","title":"Private for-profit entities (excluding Higher or Secondary Education Establishments)","displayCode":"\/Private for-profit entities (excluding Higher or Secondary Education Establishments)","attributes":{"classification":"organizationActivityType","type":"relatedOrganizationActivityType"}}],"regions":[{"name":"Madrid","rcn":"242233344","nutsCode":"ES300","parents":{"name":"Comunidad de Madrid\/Comunidad de Madrid\/Spain","rcn":"242233384\/242235944\/242387496","nutsCode":"ES30\/ES3\/ES","euCode":"ES","isoCode":"ES"},"attributes":{"type":"relatedNutsCode"}},{"name":"Spain","rcn":"242387496","nutsCode":"ES","euCode":"ES","isoCode":"ES","attributes":{"type":"relatedRegion"}}]},"contenttype":"organization","attributes":{"source":"corda","type":"isRegisteredBy"}}]},"contenttype":"result","attributes":{"source":"corda","type":"relatedResult"}},{"availableLanguages":"en","rcn":"192815","id":"674741_PS","title":"Periodic Reporting for period 2 - ELISA (SELF-BOUYANT PRECAST CONCRETE FOUNDATION FOR THE CRANELESS INSTALLATION OF COMPLETE OFFSHORE WIND TURBINES: FULL SCALE OFFSHORE PROTOTYPE)","teaser":"The offshore wind market is a young and rapidly growing market facing technological challenges, as it is set to move into deeper waters further offshore while being able to reduce the costs in order to reach a competitive LCOE (levelised cost of energy).ELISA project responds...","description":"periodic","sourceUpdateDate":"2018-07-12 16:19:13","contentUpdateDate":"2016-12-14 17:05:27","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"pubsum","title":"Report Summary","description":"Result: Publishable summary (FP7 SESAM) and Summary for publication (H2020 SyGMa)","displayCode":"\/Report Summary","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"language":"any","availableLanguages":"any","uri":"\/docs\/results\/h2020\/674\/674741_PS\/elisa-3.jpg","mimetype":"image\/jpeg","size":"0","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"any","availableLanguages":"any","uri":"\/docs\/results\/h2020\/674\/674741_PS\/elisa-6.jpg","mimetype":"image\/jpeg","size":"0","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"any","availableLanguages":"any","uri":"\/docs\/results\/h2020\/674\/674741_PS\/elisa-4.jpg","mimetype":"image\/jpeg","size":"0","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"any","availableLanguages":"any","uri":"\/docs\/results\/h2020\/674\/674741_PS\/elisa-5.jpg","mimetype":"image\/jpeg","size":"0","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"any","availableLanguages":"any","uri":"\/docs\/results\/h2020\/674\/674741_PS\/elisa-1.jpg","mimetype":"image\/jpeg","size":"0","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"any","availableLanguages":"any","uri":"\/docs\/results\/h2020\/674\/674741_PS\/elisa-2.jpg","mimetype":"image\/jpeg","size":"0","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"any","availableLanguages":"any","uri":"\/docs\/results\/h2020\/674\/674741_PS\/elisa-7.jpg","mimetype":"image\/jpeg","size":"0","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en","id":"b0c1144f2e50b66a276354e3e8d32641","archivedDate":"2025-06-20 00:00:00","physUrl":"http:\/\/www.elisaoffshore.com","status":"legacy","contenttype":"webLink","attributes":{"represents":"project","source":"corda","type":"relatedWebsite"}}]},"contenttype":"result","attributes":{"source":"corda","type":"relatedResult"}},{"language":"en","availableLanguages":"en","defaultLanguage":"en","title":"Moving wind farming into deeper waters","id":"ea90aa5bfb7679f627f2823937dd4747","physUrl":"https:\/\/ec.europa.eu\/research-and-innovation\/en\/projects\/success-stories\/all\/moving-wind-farming-deeper-waters","contenttype":"webLink","attributes":{"represents":"project","source":"editorial","type":"relatedStory"}}],"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"project","title":"Project","description":"Project factsheets","displayCode":"\/Project","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/25\/75\/469","title":"manufacturing engineering","displayCode":"\/engineering and technology\/mechanical engineering\/manufacturing engineering","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/25\/67\/425\/1169\/1695","title":"wind energy","displayCode":"\/engineering and technology\/environmental engineering\/energy and fuels\/renewable energy\/wind energy","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/25\/73\/453\/58525161","title":"sensors","displayCode":"\/engineering and technology\/electrical engineering, electronic engineering, information engineering\/electronic engineering\/sensors","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"en","code":"SME-2","title":"SME instrument phase 2","description":"SME instrument phase 2","displayCode":"\/SME instrument phase 2","attributes":{"classification":"projectFundingSchemeCategory","type":"relatedProjectFundingSchemeCategory"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}]},"modelVersion":"132","icaVersion":"20.0.0-48f81e07"}