Skip to main content
CORDIS - Forschungsergebnisse der EU
CORDIS

Disruptive process for the construction of railway transition zones, reducing drastically construction and maintenance costs

Ziel

When a train crosses from an embankment area to a bridge, tunnel or viaduct (transition zone), there is an abrupt change invertical stiffness, accelerating track degradations and generating vibrations. Hence, the embankment at transition zones are constructed differently to the rest of the track, using cement-treated soil to constitute a wedge shaped backfill. However, this construction is complex, uncertain and time-consuming, while not completely solving the vertical stiffness transition. Consequently, maintenance needs of transition zones are up to 6 times higher than regular tracks,requiring yearly about 471M€ (10% EU investment in track maintenance), while only accounting for 2,8% of total length.
TORRESCAMARA has developed DIGITALIA 2,an innovative solution for transition zones based on precast concrete slabsthat properly smooth vertical stiffness and maintain this performance over time, with the aim of: 1) Simplifying and speeding up the construction process, 2) Reducing costs of the construction process, 3)Reducing maintenance operation needs, and 4) Reducing the associated vibrations to improve passenger comfort.
The successful execution of Phase1 has led to the definition of a business model to deploy DIGITALIA 2 and reach EU market, establishing strategic alliances with potential stakeholders, users as well as commercial suppliers.In Phase2, our overall objective is to introduce DIGITALIA 2 in the market through the construction of an advanced demonstration element in the most complex and demanding conditions. We will also develop tools to ease and speed up the design,manufacturing and construction process. We will ensure a quick market deployment and promote the inclusion of DIGITALIA 2 in the specifications of railway infrastructure owners.
As a result, the commercialization of DIGITALIA 2 will lead to a revenue of nearly152M€ and a benefit of 13M€ by the 5th year, while saving construction managers over 98M€ in construction cost and 8M€ on maintenance.

Aufforderung zur Vorschlagseinreichung

H2020-SMEInst-2016-2017

Andere Projekte für diesen Aufruf anzeigen

Unterauftrag

H2020-SMEINST-2-2016-2017

Koordinator

TORRESCAMARA Y CIA DE OBRAS SA
Netto-EU-Beitrag
€ 1 527 818,60
Adresse
CL FONTETA DE SORIA 4 OLIVA
46780 VALENCIA
Spanien

Auf der Karte ansehen

KMU

Die Organisation definierte sich zum Zeitpunkt der Unterzeichnung der Finanzhilfevereinbarung selbst als KMU (Kleine und mittlere Unternehmen).

Ja
Region
Este Comunitat Valenciana Valencia/València
Aktivitätstyp
Private for-profit entities (excluding Higher or Secondary Education Establishments)
Links
Gesamtkosten
€ 2 182 598,00