Hybrid renewable energy project supplying electricity to an Irish local authority

Objective

Build a 8.52MW hybrid renewable energy project to demonstrate supplying the electricity requirements of an Irish local authority by taking advantage of electricity market liberalisation. Demonstrate the innovative aspects of new variable speed 850kW wind turbines with increased efficiency, lower impact on the electricity network and lower costs; a 1MW hydro Power plant combined to water supply upgrading; a 250kW hydro power plant linked to auxiliary water supply and a 470kW landfill gas power plant with non-catalytic oxidation to reduce emissions. Demonstrate an innovative control system which optimises electricity production in order to maximise return. Avoid 25,238 tonnes of CO2 annually by displacing 8,318 tonnes of crude oil.

Topic(s)

Data not available

Call for proposal

Third Call - 31
See other projects for this call

Funding Scheme

Data not available

Coordinator

AUTOMATED SYSTEMS AND CONTROLS LIMITED
EU contribution
No data
Address
Riverview Park, Ballytrasna
LISSARDA, CO. CORK
Ireland

See on map

Total cost
No data

Participants (4)