Skip to main content

Rubble mound breakwater failure modes

Objective



The objective of this research project is to contribute to the development of rational methods for the design of rubble mound breakwaters. The project concentrates on the analysis of breakage of armour made up of randomly placed, large unreinforced armour units and the interaction/correlation between important failure modes such as scour and instability of toe berm, main armour, wave wall, and rear slope instability.

The project methodology, although is mainly experimental, also includes advanced hydraulic model test techniques. Theoretical studies will include system reliability analyses of complete structures.

The expected achievements will make a significant contribution to the elaboration of more sound guidelines for coastal engineers, the use of which will result in structures free from the frequently seen unexpected failures.

Call for proposal

Data not available

Coordinator

Ålborg Universitetscenter
Address
57,sohngårdsholmsvej
9000 Ålborg
Denmark

See on map

Participants (9)

CENTRO DE ESTUDIOS Y EXPERIMENTACION DE OBRAS PUBLICAS
Spain
Address
81,c/ Antonio Lopez 81
28026 Madrid

See on map

Danmarks Tekniske Universitet
Denmark
Address
115,bygning
2800 Lyngby

See on map

Dansk Hydraulisk Institut
Denmark
Address
5,agern Allé
2970 Hørsholm

See on map

H R Wallingford Group Ltd
United Kingdom
Address
Howberry Park
OX10 8BA Wallingford

See on map

STICHTING WATERLOOPKUNDIG LABORATORIUM (WL/DELFT HYDRAULICS)
Netherlands
Address
185,rotterdamseweg 185
2600 MH Delft

See on map

Technische Universiteit Delft
Netherlands
Address
1,stevinweg 1
2628 BL Delft

See on map

UNIVERSITAET HANNOVER
Germany
Address
Nienburger Straße 4
30167 Hannover

See on map

UNIVERSITY OF BOLOGNA
Italy
Address
Viale Del Risorgimento 2
40136 Bologna

See on map

UNIVERSITY OF ROME "LA SAPIENZA"
Italy
Address
Via Eudossiana 18
00184 Roma

See on map