Smart condition monitoring and prompt NDT assessment of large concrete bridge structures

Project information

Grant agreement ID: 286981

Status

Closed project

  • Start date

    1 November 2011

  • End date

    31 January 2014

Funded under:

FP7-SME

  • Overall budget:

    € 1 066 928,80

  • EU contribution

    € 823 400

Coordinated by:

TWI LIMITED

United Kingdom

Objective

Today pre-stressed concrete bridges represent well over 50 percent of all bridges built. This increase has resulted from advancements in design and analysis procedures and materials, however the life of a concrete structure is still dependant on corrosion of the many internal steel reinforcements. As above, there appears to be a complete lack of appropriate international standards or specific regulations dealing with the Ultrasonic non-destructive testing (NDT) of concrete and reinforced concrete bridge structures. NDT methods for concrete structures consist of Impact hammer echo, ultrasonic velocity, radiography, Quantitative Acoustic Emission (QAE) and Ground Penetrating Radar (GPR). However, they all provide limited information and require a high level of technical interpretation.

Cross-It project will develop a new technology based on Ultrasonic Guided Waves, Automotive thermography and advanced GPR techniques to inspect the concrete structure for dangerous levels of age-related degradation, which could consist of cracks due to water ingress and corrosion of internal steel re-bars and reinforcement.

The developed Guided Waves technology will be able to scan the concrete and display the results as a visual map on a connected laptop. The laptop will run a purpose designed condition monitoring program based on advanced artificial Intelligence like a Neural Networks to match the ultrasonic patterns. Cross-it system could be also permanently installed to the bridge structure to enable a real time structural health monitoring system.
Leaflet | Map data © OpenStreetMap contributors, Credit: EC-GISCO, © EuroGeographics for the administrative boundaries

Coordinator

TWI LIMITED

Address

Granta Park Great Abington
Cb21 6al Cambridge

United Kingdom

Activity type

Research Organisations

EU Contribution

€ 78 555

Administrative Contact

Nigel Lee (Mr.)

Participants (5)

NATIONAL TECHNICAL UNIVERSITY OF ATHENS - NTUA

Greece

EU Contribution

€ 27 800

TECHNOLOGY ASSISTANCE BCNA 2010 SL

Spain

EU Contribution

€ 239 012

INETEC-INSTITUT ZA NUKLEARNU TEHNOLOGIJU DRUSTVO S OGRANICENOM ODGOVORNOSCU ZA ISTRAZIVACKO RAZVOJNE I KONSULTING USLUGE, PROIZVODNJU I TRGOVINU

Croatia

EU Contribution

€ 232 654

ACUTECH EISAGOGES ANTIPROSOPEIES EPE

Greece

EU Contribution

€ 230 079

ATKINS CONSULTANTS LIMITED

United Kingdom

EU Contribution

€ 15 300

Project information

Grant agreement ID: 286981

Status

Closed project

  • Start date

    1 November 2011

  • End date

    31 January 2014

Funded under:

FP7-SME

  • Overall budget:

    € 1 066 928,80

  • EU contribution

    € 823 400

Coordinated by:

TWI LIMITED