Skip to main content
European Commission logo print header

Simulation Enhanced Integrated Systems for Model-based Intelligent Control(s)

Objectif

EINSTEIN addresses the scientific and technical challenges related to the optimization of energy efficiency in existing buildings. This is achieved through the development of a new innovative modular simulation-based building control system. This has the ability to: (i) exploit real-time holistic building simulation (integrated with diverse building systems), (ii) directly enable automated control actions of a building and its surroundings (adaptively) and (iii) provide considerable energy savings to the building (by an optimized algorithm). EINSTEIN will formulate and integrate a number of new control strategies to be used with the simulation-based building control system to provide the building manager with the optimum energy efficiency solutions for their building and its use by its occupants. It will not only eradicate errors between ‘as-built’ and ‘as-designed’ conditions but also include predictive analysis with respect to how the building will perform, taking into account future weather predictions and occupant use. The control strategies will be tested and validated on a number of existing buildings

Appel à propositions

FP7-PEOPLE-2013-IAPP
Voir d’autres projets de cet appel

Coordinateur

INTEGRATED ENVIRONMENTAL SOLUTIONS LIMITED
Contribution de l’UE
€ 338 002,72
Adresse
KELVIN CAMPUS WEST OF SCOTLAND SCIENCE PARK HELIX BUILDING
G20 0SP Glasgow
Royaume-Uni

Voir sur la carte

Région
Scotland West Central Scotland Glasgow City
Type d’activité
Private for-profit entities (excluding Higher or Secondary Education Establishments)
Contact administratif
Ruth Kerrigan (Dr.)
Liens
Coût total
Aucune donnée

Participants (1)