Skip to main content
European Commission logo print header
Zawartość zarchiwizowana w dniu 2024-04-15

UTILITY UTILILIZATION POTENTIAL : COORDINATION AND CONTROL ACTIONS, STUDY OF NECESSARY POWER PLANT MODIFICATION

Cel

A PROPER COORDINATION OF THE SIMULATION STUDIES ON THE INDIVIDUAL ELECTRICAL GRIDS OF THE NINE MEMBER STATES THUS AVOIDING DUPLICATION OF EFFORTS.
- CENTRAL DATA COLLECTION AND PROCESSING FOR THE CONCERTED ACTION: WIND TURBINE EXPERIMENT PROJECT.
- OVERALL REPORTS ON THE RESULTS OF THE PROJECTS.

THE SCOPE OF THE CONTRACT CONSISTS OF THREE AREAS:
A) SIMULATION STUDIES FOR 9 EUROPEAN ELECTRICITY GENERATION SYSTEMS AND SOME SPECIFIC STUDIES IN THE FIELDS OF GRID MANAGEMENT AND POSSIBLE POWER STATION MODIFICATIONS.
B) ESTABLISHING OF A CENTRAL COMPUTER FOR THE PROGRAMME (NEXT TO COME) WIND TURBINE EXPERIMENT PROJECT.
C) A SURVEY OF THE WIND R&D ACTIVITIES IN AND OUTSIDE EUROPE.

Temat(-y)

Data not available

Zaproszenie do składania wniosków

Data not available

System finansowania

CSC - Cost-sharing contracts

Koordynator

Rise Consult APS
Wkład UE
Brak danych
Adres

7000 Fredericia
Dania

Zobacz na mapie

Koszt całkowity
Brak danych