EXPLORATORY DRILLING OF GEOTHERMAL FIELD IN AZORES PRECEEDED BY A SHORT ADDITIONAL GEOPHYSICAL SURVEY FOR BETTER DEFINITION OF CONDITION ZONES AND STRUCTURES.

Cel


Well CL-1 was planned in an effort to develop high temperature geothermal resources for the production of electric power to supply a portion of the power demand of the island of Sao Miguel. Drilling of CL-1 was successfully completed in February 1989. At that time, monitoring and testing activities were begun as the well heated up after drilling. Tests have confirmed that CL-1 is a commercially productive geothermal well and that a high temperature resource exists in Cachacos-Lombadas.
The primary purpose of this report is to present a description and analysis of the data collected during the short term flow test.

Temat(-y)

Data not available

Zaproszenie do składania wniosków

Data not available

System finansowania

CSC - Cost-sharing contracts

Koordynator

Electricidade dos Açores S.A.
Wkład UE
Brak danych
Adres
Rue Eng. José Cordeiro 6
9500 Ponta Delgada
Portugalia

Zobacz na mapie

Koszt całkowity
Brak danych