Cel Well CL-1 was planned in an effort to develop high temperature geothermal resources for the production of electric power to supply a portion of the power demand of the island of Sao Miguel. Drilling of CL-1 was successfully completed in February 1989. At that time, monitoring and testing activities were begun as the well heated up after drilling. Tests have confirmed that CL-1 is a commercially productive geothermal well and that a high temperature resource exists in Cachacos-Lombadas. The primary purpose of this report is to present a description and analysis of the data collected during the short term flow test. Dziedzina nauki engineering and technologyelectrical engineering, electronic engineering, information engineeringelectrical engineeringelectric energyengineering and technologyenvironmental engineeringenergy and fuelsrenewable energygeothermal energy Program(-y) FP1-ENNONUC 3C - Research and development programme (EEC) in the field of Non-Nuclear Energy, 1985-1988 Temat(-y) Data not available Zaproszenie do składania wniosków Data not available System finansowania CSC - Cost-sharing contracts Koordynator Electricidade dos Açores S.A. Wkład UE Brak danych Adres Rue Eng. José Cordeiro 6 9500 Ponta Delgada Portugalia Zobacz na mapie Koszt całkowity Brak danych