Objective AN ORC ENGINE DRIVEN HEAT PUMP OF 10 KW WAS TO BE DEVELOPED BY GLYNWED, UK. THE ORC TURBINE AND THE VAPOUR COMPRESSION OF THE HEAT PUMP IS ON THE SAME AXIS. THIS HEAT PUMP MAY BE FIRED BY OIL, GAS, WOOD OR WASTE HEAT AND COP VALUES OF 1,2 HAVE BEEN OBTAINED. PROBLEMS WITH ROTORS AND BEARINGS TURNED OUT TO BE INSUPERABLE AND THE PROJECT HAS THEREFORE BEEN STOPPED. PROBLEMS WITH ROTORS AND BEARINGS HAS STOPPED THE RESEARCH BEFORE THE DATE. Programme(s) PRE-ENNONUC 2C - Energy research and development programme (EEC), 1979-1983 Topic(s) Data not available Call for proposal Data not available Funding Scheme Data not available Coordinator Glynwed Group Services Ltd EU contribution No data Address 15a Cranmore Drive Shirley B90 Solihull United Kingdom See on map Total cost No data