Cel AN ORC ENGINE DRIVEN HEAT PUMP OF 10 KW WAS TO BE DEVELOPED BY GLYNWED, UK. THE ORC TURBINE AND THE VAPOUR COMPRESSION OF THE HEAT PUMP IS ON THE SAME AXIS. THIS HEAT PUMP MAY BE FIRED BY OIL, GAS, WOOD OR WASTE HEAT AND COP VALUES OF 1,2 HAVE BEEN OBTAINED. PROBLEMS WITH ROTORS AND BEARINGS TURNED OUT TO BE INSUPERABLE AND THE PROJECT HAS THEREFORE BEEN STOPPED. PROBLEMS WITH ROTORS AND BEARINGS HAS STOPPED THE RESEARCH BEFORE THE DATE. Program(-y) PRE-ENNONUC 2C - Energy research and development programme (EEC), 1979-1983 Temat(-y) Data not available Zaproszenie do składania wniosków Data not available System finansowania Data not available Koordynator Glynwed Group Services Ltd Wkład UE Brak danych Adres 15a Cranmore Drive Shirley B90 Solihull Zjednoczone Królestwo Zobacz na mapie Koszt całkowity Brak danych