FLEXIBLE COGENERATION FOLLOWING HEAT DEMAND

Obiettivo

To improve energy saving on an existing urban waste incineration plant.
The way the plant operates now is such that the expectation in relation with energy saving will be realised.
One out of three existing municipal waste incinerators of Arnhem is provided with a boiler supplying hot water (26 MWTH) to a district heating network. A steam boiler with 10% spare capacity (29 MWTH) & condensation turbine (10 MWE) is installed to supply heat and/or electricity.
During low heat demand periods, the existing boiler serves as pre-heating unit for the steamboiler, allowing efficiency improvement increase in thermal energy for the DH network as high as 100 TJ/year while the electric production (73,5 GWH) is purchased by the local company.
Innovation : existing hot water boiler improves efficiency of cogenerative steamboiler during low heat-demand period (summer).

Invito a presentare proposte

Data not available

Meccanismo di finanziamento

DEM - Demonstration contracts

Coordinatore

REGIO ARNHEM
Contributo UE
Nessun dato
Indirizzo
KRONENBURGSINGEL 515 P.O. BOX 9039
6031 GM ARNHEM
Paesi Bassi

Mostra sulla mappa

Costo totale
Nessun dato