Obiettivo To improve energy saving on an existing urban waste incineration plant.The way the plant operates now is such that the expectation in relation with energy saving will be realised.One out of three existing municipal waste incinerators of Arnhem is provided with a boiler supplying hot water (26 MWTH) to a district heating network. A steam boiler with 10% spare capacity (29 MWTH) & condensation turbine (10 MWE) is installed to supply heat and/or electricity.During low heat demand periods, the existing boiler serves as pre-heating unit for the steamboiler, allowing efficiency improvement increase in thermal energy for the DH network as high as 100 TJ/year while the electric production (73,5 GWH) is purchased by the local company.Innovation : existing hot water boiler improves efficiency of cogenerative steamboiler during low heat-demand period (summer). Programma(i) ENG-ENDEMO C - Programme (EEC) of demonstration projects and industrial pilot projects (EEC) in the energy field, 1985-1989 Argomento(i) 3.3 - ENERGY INDUSTRY Invito a presentare proposte Data not available Meccanismo di finanziamento DEM - Demonstration contracts Coordinatore REGIO ARNHEM Contributo UE Nessun dato Indirizzo KRONENBURGSINGEL 515 P.O. BOX 9039 6031 GM ARNHEM Paesi Bassi Mostra sulla mappa Costo totale Nessun dato