Obiettivo Construction and operation of a plant for electrostatic separation of ash/pyrites from coal. The plant will have a throughput of 5 t /hour and will be equipped with self-cleaning electrodes. The aim is to treat coals mainly for use in coal-water mixtures and it is epxected that a product of 95-98 % purity will be obtained, with an energy recovry of 90 %. It is planned to demonstrate the process on at least 50000 T of coal of varying origin.The plant will be made by 3 electrostatic fields in series and will be a section of the existing plant for the production of coal-water slurry. Programma(i) ENG-ENDEMO C - Programme (EEC) of demonstration projects and industrial pilot projects (EEC) in the energy field, 1985-1989 Argomento(i) 8.6 - VARIOUS Invito a presentare proposte Data not available Meccanismo di finanziamento DEM - Demonstration contracts Coordinatore Enichem Anic SpA Contributo UE Nessun dato Indirizzo Piazza Boldrini 1 20097 San Donato Milanese Italia Mostra sulla mappa Costo totale Nessun dato