Obiettivo Aim of this project is the development of a new generation of subsea system specifically conceived for hydrocarbon production in deepwater (200-600 m w. d. ) and very deep water (beyond 600 m w,d, ) including a dedicated remote controlled installation and maintenance system.During Phase 2 - Stage B, the prototypes of both the production system and the maintenance system will be nanufactured.A prototype will be installed and tested on a live well.This constitutes the Phase 3 of the project.During Phase 1, the engineering of the production system and the maintenance device has been performed.During Phase 2 the prototype of the production system and the maintenance has been manufactured.Phase 2 is splitted in two stages. During Stage A qualified manufacturers have been selected and the construction engineering performed.During Stage B the subsystems have been manufactured. The captioned project (TH/03. 294/88) is relevant to Phase 2 - Stage B. Integration of the systems, dry tests, installation on a live well and long term tests are the scope of Phase 3 which will be exexuted in contract TH./03300/89. Programma(i) ENG-HYDROCARB 2C - Programme (EEC) of support for technological development in the hydrocarbons sector, 1986-1989 Argomento(i) 1.9 - PRODUCTION SYSTEMS Invito a presentare proposte Data not available Meccanismo di finanziamento DEM - Demonstration contracts Coordinatore ENI SpA- AGIP Contributo UE Nessun dato Indirizzo VIA EMILIA 1 20097 S. Donato Milanese (MILANO) Italia Mostra sulla mappa Costo totale Nessun dato