Objetivo To utilise existing irrigation conduits for the production of electricity.This project is to utilise an existing irrigation infrastructure for a hydroelectric station, which will partially offset power used for pumping water in other parts of the system.An added benefit is that the discharge water will flow into the Lake Urbino, which has a very high natural salinity level. The in -flow of a controlled quantity of fresh water will both reduce salinity and increase oxygenation, this improving the lake eco -system and allowing the promotion of agriculture. Head 100 metres (net)Flow 0. 75 m3. s -1Turbine FrancisTurbine power 700 kWSpeed 1000 rpmGenerator asynchronousEnd-use grid-connected Programa(s) ENG-ENDEMO C - Programme (EEC) of demonstration projects and industrial pilot projects (EEC) in the energy field, 1985-1989 Tema(s) Data not available Convocatoria de propuestas Data not available Régimen de financiación DEM - Demonstration contracts Coordinador Office d'Équipement Hydraulique de la Corse Aportación de la UE Sin datos Dirección Avenue Paul Giacobbi 20601 Bastia Francia Ver en el mapa Coste total Sin datos