Objectif Development of a retorting process for the extraction of hydrocarbons from bituminous rocks and/or sands.A patent application concerning the new retorting process was drawn up and filed. The tests on a rotary drum have led to a definition of the criteria for the design of a pilot plant with a capacity of 48 MTPD.The basic study of the industrial plant (50 000 MPTD) has been completed. It concerned material and heat balances. A rotary drum and two main furnaces were also designed. Laboratory tests showed that pyrolysis of bituminous rock could be carried out with 13 kg of HC per 200 kg of impregnated rock.The new process to be developed is characterized by the way in which retorthing heat is supplied in a special reactor where no intermediates are used (whether gas or inert solid).The main phases of the project are:1. basic study (identification of the necessary chemical physical parameters, optimization of the pilot plant capacity, planning of laboratory tests, preliminary financial calculation)2. construction of a pilot plant3. laboratory and pilot plant tests.If the results of phase 3 are positive, a semi-industrial plant (500 to 1 000 tpd)could be envisaged in a later stage. Programme(s) ENG-HYDROCARB 1C - Programme (EEC) of Community projects in the hydrocarbons sector, 1973-1985 Thème(s) 1.5 - IMPROVED OIL RECOVERY Appel à propositions Data not available Régime de financement DEM - Demonstration contracts Coordinateur Ammonia Casale Contribution de l’UE Aucune donnée Adresse Via Lampedusa 13 20141 Milano Italie Voir sur la carte Coût total Aucune donnée