Cel This project had three objectives:1) laboratory experiments to determine the factors involved in the action of DC current on rock samples saturated with water and oil2) general technological studies (surface and wells)3) feasibility studies of a pilot test on Eschau field (Alsace).This work showed the technical feasibility ot the process and outlined solutions for the method and equipment to be used. However, to go to the next step of realizing a pilot test would require a considerable extention of technical studies to achieve detailed specifications of equipment.Laboratory tests were made with Fontainebleau sandstones and Eschau Limestones.Technological preliminary studies included:- heating effects of current in the well- well equipment: study of different solutions for current transport the Anode technology well completion - surface equipment: current generator/protection equipment. Modelling of Eschau field (hydraulic/electrical) were made. Site studies on Eschau were made. Program(-y) ENG-HYDROCARB 1C - Programme (EEC) of Community projects in the hydrocarbons sector, 1973-1985 Temat(-y) 1.5 - IMPROVED OIL RECOVERY Zaproszenie do składania wniosków Data not available System finansowania DEM - Demonstration contracts Koordynator GERTH Wkład UE Brak danych Adres 232 AV. NAPOLEON BONAPARTE 92500 Rueil Malmaison Francja Zobacz na mapie Koszt całkowity Brak danych