Skip to main content
European Commission logo print header
Contenuto archiviato il 2022-12-27

USE OF LOW HEAD (6 M) TO DRIVE KAPLAN TURBINE ON INLET OR OUTLET OF WATER TREATMENT WORKS

Obiettivo

The basic objective of the project is the exploitation of the existing civil engineering structures along the main irrigation channel which has its origin at the river of Nestos, close to the village of Paradisos. The innovative aspect consists of using the existing civil engineering works, the irrigation channel geometry and a system of multiple pipes (as a penstock) to direct the water to the turbines. The estimated capacity is 800 kW. The electricity which will be produced will be sold to the grid.

The innovative aspect of this project is the efficient use and exploitation of existing hydraulic structures for irrigation to produce electrical power, keering low the cost per installed kW.

Argomento(i)

Data not available

Invito a presentare proposte

Data not available

Meccanismo di finanziamento

DEM - Demonstration contracts

Coordinatore

MUNICIPAL WATER WORKS OF XANTHI
Contributo UE
Nessun dato
Indirizzo
MAYOR RHILI AMIRIDIS
67100 THRACE
Grecia

Mostra sulla mappa

Costo totale
Nessun dato