Cel To build a demonstration plant for the calcination of anodes (to be used in the electrolysis of aluminium) in tunnel-type continuous ovens, with energy saving both at the production stage and while in use.To build a demonstration plant consisting of two tunnel anodes to calcinate ovens with the following objectives:- decrease in energy consumption through improvementof the thermal cycle.- increased recovery of energy through adequate heat recovery equipments.- energy saving in the use of the anodes thanks to improved physico-chemical characteristics of the finished anodes.- reduced pollution in the calcination steps.- improved working environment for the personnel.- lower operating costs.The pilot plant will be built in the Alusuisse Italia SpA plant in Porto Marghera (Venezia).For a production of 72,000 t/yr of anodes (having each a length of 1,150 mm) the savings are:- saving in production 5,134 TOE/yr- saving in use 6,537 TOE/yr Total saving 11,671 TOE/yrThe plant will consist of a pre-heating tunnel and a tunnel-type oven with the necessary conveyors. In the second stage a second calcination tunnel will be added to reach the 72,000 TOE/yr capacity.The first stage started on 1.10.85 and is due to be completed by 30.11.87; it will include the development of the energy saving thermal cycle. The building of the second phase (second tunnel) is scheduled to start 1.11.87 and to be completed by 31.3.89. Program(-y) ENG-ENALT 2C - Programme (EEC) of demonstration projects relating to the exploitation of alternative energy sources and to energy saving and the substitution of hydrocarbons, 1983-1985 Temat(-y) 3.2 - INDUSTRY Zaproszenie do składania wniosków Data not available System finansowania DEM - Demonstration contracts Koordynator ALUSUISSE ITALIA SPA Wkład UE Brak danych Adres DIVISIONE ALUCENTRO PORTO MARGHERA (VENEZIA) Włochy Zobacz na mapie Koszt całkowity Brak danych