Objectif The demonstration project involves the development of an automatic full size system pressing process known as semi-hot pressing.Since the process employed currently do not meet the requirements for the quality and use of steels with a high C content, it is proposed the innovative semi-hot pressing system consisting in the following : heating the material to 700-750 deg. C (recrystallisation temp. to enable permanent deformation of high C content steels), semi-hot pressing, cold coining. The main new equipment is a 1250 tons semi-hot press.Innovation lies in the new semi-hot press. The system is new for Europe. Programme(s) ENG-ENDEMO C - Programme (EEC) of demonstration projects and industrial pilot projects (EEC) in the energy field, 1985-1989 Thème(s) 3.4 - INDUSTRY Appel à propositions Data not available Régime de financement DEM - Demonstration contracts Coordinateur Teksid SpA Astek Contribution de l’UE Aucune donnée Adresse Via G. Agnelli 60 10022 Carmagnola Torino Italie Voir sur la carte Coût total Aucune donnée