Objectif To demonstrate that an economic saving of about 2500 TOE/y can be achieved in an industrial plant, by installing a new 1300 KWE cogeneration plant using a water-organic mixture working fluid.A cogenerative unit, 1300 kWe, 7800 kWth is installed using a water + 9% organic mixture as the working fluid. Highe peak temperatures and better efficiencies are thus reached. Innovative aspects : the utilization of a water + 9% dowterm mixture as the working fluid, and the double pressure vapour utlization circuits. Programme(s) ENG-ENDEMO C - Programme (EEC) of demonstration projects and industrial pilot projects (EEC) in the energy field, 1985-1989 Thème(s) 3.4 - INDUSTRY Appel à propositions Data not available Régime de financement DEM - Demonstration contracts Coordinateur CARNOT SA Contribution de l’UE Aucune donnée Adresse AV. HERNANOS BOU 239 12003 Castellon Espagne Voir sur la carte Coût total Aucune donnée