Continuous monitoring of the structural condition of the tower and supporting structure of floating and static offshore wind turbines

Project information

Grant agreement ID: 605013

Status

Closed project

  • Start date

    1 March 2014

  • End date

    31 October 2017

Funded under:

FP7-SME

  • Overall budget:

    € 2 065 478,04

  • EU contribution

    € 1 469 000

Coordinated by:

CAPENERGIES ASSOCIATION

France

Objective

There is a growing interest in monitoring techniques and systems which can provide information about the condition of a wind turbine support structure, owing to a number of operational factors which have become apparent as increased numbers of turbine installations are experiencing longer periods of time in service. These include:
• Instances of fatigue cracking in the support towers
• Flange bolts at the ends of the tower sections becoming loose
• Higher than expected levels of vibration, which could cause either of the above mechanisms
• Degradation of the grouted joint between the pile and transition piece in offshore installations.
Wind farm operators are becoming increasingly concerned at the inability to predict remaining life of the installations, as this a rapidly expanding sector and there is little information about likely rates of structural degradation and failure modes. In addition, experience from operation of older wind farms is of limited value, because the specification of these installations is evolving rapidly, with the capacity (and therefore size and weight) of the generator becoming larger and the consequent dimensions of the tower increasing. The effect is that it is very difficult to extrapolate experience with existing structures to the likely behaviour of new ones.
On these installations there are very large surface areas/volumes of material to be examined and degradation may occur almost anywhere, so that the inspection task is not trivial. Furthermore, there is no established structural monitoring industry dedicated to the wind sector.
The aim of this project is the development of suitable and reliable techniques for monitoring of wind turbine tower structures and joint that could suffer from grout damage and slippage.
This project will also develop a best practice and standardisation of the methods involved and that a programme of information and training for inspection personnel is produced and implemented.

Coordinator

CAPENERGIES ASSOCIATION

Address

Avenue Louis Philibert Batiment Henri Poincare Domaine Du Petit Arbois
13547 Aix En Provence Cedex 4

France

Activity type

Other

EU Contribution

€ 280 034,90

Administrative Contact

Paul Lucchese (Mr.)

Participants (15)

INNORA PROIGMENA TECHNOLOGIKA SYSTIMATA KAI YPIRESIES AE

Greece

EU Contribution

€ 39 601,60

AALBORG KOMMUNE

Denmark

EU Contribution

€ 1 867,20

Associazione Italiana Prove Non Distruttive

Italy

EU Contribution

€ 353 855

KINGSTON COMPUTER CONSULTANCY LIMITED

United Kingdom

EU Contribution

€ 37 580

SMITHERS PURSLOW PROPERTY SERVICES LTD

United Kingdom

TEKNISK DATA AS

Norway

EU Contribution

€ 22 086,06

WLB LIMITED

Cyprus

EU Contribution

€ 30 450,80

CENTRE TECHNIQUE DES INDUSTRIES MECANIQUES

France

EU Contribution

€ 62 527

AINOOUCHAOU PLIROFORIKI AE

Greece

TWI LIMITED

United Kingdom

EU Contribution

€ 72 016,54

CLUSTER DE ENERGIAS RENOVABLES Y SOLUCIONES ENERGETICAS EN CASTILLA Y LEON

Spain

EU Contribution

€ 108 757,30

TECOPY SA

Spain

EU Contribution

€ 17 238,70

MONITEYE LTD

United Kingdom

EU Contribution

€ 42 631,20

ASOCIACION EMPRESARIAL EOLICA

Spain

EU Contribution

€ 362 550,75

COWI AS

Norway

EU Contribution

€ 37 802,95

Project information

Grant agreement ID: 605013

Status

Closed project

  • Start date

    1 March 2014

  • End date

    31 October 2017

Funded under:

FP7-SME

  • Overall budget:

    € 2 065 478,04

  • EU contribution

    € 1 469 000

Coordinated by:

CAPENERGIES ASSOCIATION

France