Servicio de Información Comunitario sobre Investigación y Desarrollo - CORDIS

H2020

UPGRID

Project ID: 646531
Financiado con arreglo a

Real proven solutions to enable active demand and distributed generation flexible integration, through a fully controllable LOW Voltage and medium voltage distribution grid

Desde 2015-01-01 hasta 2017-12-31, proyecto cerrado | UPGRID Sitio web

Detalles del proyecto

Coste total:

EUR 15 614 856,28

Aportación de la UE:

EUR 11 937 258

Coordinado en:

Spain

Convocatoria de propuestas:

H2020-LCE-2014-3See other projects for this call

Régimen de financiación:

IA - Innovation action

Objetivo

Deliverables

  • Evaluation of Demonstration Results and Data collection

    This deliverable will be the product of tasks 4.3 and 4.4 which includes the report on the evaluation of the demonstration, including results, and the collection of data relevant for further analysis at project level, namely KPIs and cross demonstration analysis.

  • Report on the performance of the selected tools that were tested in laboratory

    Description of the performance of the selected tools tested in laboratory.

  • Incentive framework for facilitating investments in UPGRID innovative concepts

    This deliverable will synthesize relevant project results including the expected economic and environmental benefits of a mass-market rollout of UPGRID solutions. This task will consider provisions that regulatory agency may establish to allow distribution companies to include the risk associated with new technologies in network planning investment programmes. This will lead to a roadmap and a thereof derived list of actions to prepare the successful rollout of UPGRID solutions throughout Europe. The report will outline the key changes in commercial and regulatory policy frameworks that will be needed to achieve the key policy evolution milestones, particularly focusing on risk management associated with UPGRID paradigm and facilitating efficient strategic investment in new technologies under uncertainty. The roadmap will also take into account a number of stakeholder perspectives involved, including network operators, energy suppliers, regulators and policy makers. The very final output will thus be a clear set recommendations to different stakeholders as to how to make the demo based UPGRID experience a reality for the millions of EU electricity customers.

  • Report on Market barriers for deployment of UPGRID innovative concepts

    The key aim of this deliverable is to identify barriers in the present regulatory and commercial framework and limitations of the existing distribution network operation and design standards, particularly in 4 Demo Region, that may limit or prevent roll-out of UPGRID innovative concepts and solutions. This will involve critical assessment of the regulatory incentives to invest in both smart and traditional networks solutions while considering conflicts and synergies between electricity network and energy supply objectives, including present network operation and planning practices.

  • Systems testing and optimization

    The deliverable 6.5 includes the solution test, analysis and examining the scalability possibilities over the whole OSD area. The report will include results solution built within the project, particularly: • Report about the demonstrator various functions tests and optimisation • Report containing new rules for electric power system management • Report defining new rules for electric power system development (if the demonstrator operation will show such possibility)

  • Report on non-technical local incentives and barriers

    Description of the non-technical local incentives and barriers take into account regulation and incentives,policy context, economic conditions, market uptake and business opportunities expectations and societal and final user related issues.

  • Report on the implementation of CIM as the reference data model for the project

    The report will gather all the relevant information about the application of CIM model and the associated messages in the project. It will include: model requirements of the MV/LV networks in the scope of the project, coverage of the general CIM model, application of other developed MV/LV CIM profiles, design of MV/LV CIM extensions if this is necessary, guidelines for applying the CIM in the project, coverage of the standardized IEC 61968/62325 messages, development of new MV/LV CIM messages if this is necessary, the guidelines for using the messages and the guidelines for developing new messages to assure the interoperability.

  • Result of the demonstration project

    T5.3.1.- Report: Evaluation of the achieved performance Content: -Technical result of the project demonstration. -Cost benefit analyzes of the demonstration project -Final illustrations of developed system functionalities from each system provider

  • Targeted Social stakeholders segmentation and analysis.

    Analysis on targeted social stakeholders segmentation. Description of social stakeholders.

  • Conclusions of Load and Generation Forecasting; Data analysis, model identification and model validation procedures

    Conclusions of Load and Generation Forecasting; Data analysis, model identification and model validation procedures

  • Report about KPIs analysis and methods of comparison

    This document will present the results of the analysis and validation of the KPIs, methods and alternatives of comparison, that were previously identified and defined in WP1 for each demonstration with respect their actual implementation in those correspondent demonstration allowing the revision and validation of the initial hypotheses performed.

  • Report on Services provided by DSOs to the retail market

    The D2.2 report will provide the identification, specification and technical design of the EDR, DEC and IEM set of services for the Demand Side Management, which will be tested through proof-of-concept in a pilot trial with a set of clients in the EDP and Iberdrola test sites.

  • Demonstration results Evaluation and Opportunities

    Evaluate the performance of the improved real operation with the expected results. Interaction and support to network planning, by providing high level of detail on the performance of specific areas of LV networks. Analyze different DSO processes evaluating the possible improvement achieved on them as a consequence of the innovations being carried out in the demonstration.

  • Report on common KPIs

    Definition of common KPIs to monitor the performance of each of the demonstrations that will be running at the end of the project in order to ensure the reliability, success, quality and cost of the different targets of the project. The KPIs will be focused on Supervisory and control parameters of the LV network of the different pilot sites and they will be use to validate and compare the results of the project.

  • Report on standards and potential synergies

    Description of the implementation of standardized solutions and improvements in some of the proposed demo projects by maximizing the use of interoperable and standardized equipment.

Publications

Coordinador

IBERDROLA DISTRIBUCION ELECTRICA, S.A.
Spain

Aportación de la UE: EUR 1 569 725


AVENIDA SAN ADRIAN 48
48003 BILBAO
Spain
Activity type: Private for-profit entities (excluding Higher or Secondary Education Establishments)

Contact the organisation

Participantes

EDP DISTRIBUICAO ENERGIA SA
Portugal

Aportación de la UE: EUR 1 777 125


RUA CAMILO CASTELO BRANCO 43
1050 044 LISBOA
Portugal
Activity type: Private for-profit entities (excluding Higher or Secondary Education Establishments)

Contact the organisation

VATTENFALL ELDISTRIBUTION AB
Sweden

Aportación de la UE: EUR 1 055 749


JAMTLANDSGATAN 99
162 87 STOCKHOLM
Sweden
See on map
Activity type: Private for-profit entities (excluding Higher or Secondary Education Establishments)

Contact the organisation

ENERGA OPERATOR SA
Poland

Aportación de la UE: EUR 390 030,75


UL MARYNARKI POLSKIEJ 130
80 557 GDANSK
Poland
Activity type: Private for-profit entities (excluding Higher or Secondary Education Establishments)

Contact the organisation

FUNDACION TECNALIA RESEARCH & INNOVATION
Spain

Aportación de la UE: EUR 893 250


PARQUE CIENTIFICO Y TECNOLOGICO DE GIPUZKOA PASEO MIKELETEGI 2
20009 DONOSTIA SAN SEBASTIAN
Spain
Activity type: Research Organisations

Contact the organisation

IMPERIAL COLLEGE OF SCIENCE TECHNOLOGY AND MEDICINE
United Kingdom

Aportación de la UE: EUR 589 459


SOUTH KENSINGTON CAMPUS EXHIBITION ROAD
SW7 2AZ LONDON
United Kingdom
Activity type: Higher or Secondary Education Establishments

Contact the organisation

UNIVERSIDAD PONTIFICIA COMILLAS
Spain

Aportación de la UE: EUR 517 606


CALLE ALBERTO AGUILERA 23
28015 MADRID
Spain
Activity type: Higher or Secondary Education Establishments

Contact the organisation

INESC TEC - INSTITUTO DE ENGENHARIA DE SISTEMAS E COMPUTADORES, TECNOLOGIA E CIENCIA
Portugal

Aportación de la UE: EUR 586 937,50


RUA DR ROBERTO FRIAS CAMPUS DA FEUP
4200 465 PORTO
Portugal
Activity type: Research Organisations

Contact the organisation

ZIV METERING SOLUTIONS SL
Spain

Aportación de la UE: EUR 449 645


PARQUE TECNOLOGICO DE ZAMUDIO EDI 210
48170 ZAMUDIO VIZCAYA
Spain
Activity type: Private for-profit entities (excluding Higher or Secondary Education Establishments)

Contact the organisation

WITHUS - INOVACAO E TECNOLOGIA LDA
Portugal

Aportación de la UE: EUR 260 050


RUA DR MARIO SACRAMENTO EDIFICIO COLOMBO 1 1 Q
3810 104 AVEIRO
Portugal
Activity type: Private for-profit entities (excluding Higher or Secondary Education Establishments)

Contact the organisation

NOS COMUNICACOES SA
Portugal

Aportación de la UE: EUR 232 750


RUA ACTOR ANTONIO SILVA 9 CAMPO GRANDE
1600 404 LISBOA
Portugal
Activity type: Private for-profit entities (excluding Higher or Secondary Education Establishments)

Contact the organisation

POWEL AS
Norway

Aportación de la UE: EUR 502 250


KLAEBUVEIEN 194
7037 TRONDHEIM
Norway
Activity type: Private for-profit entities (excluding Higher or Secondary Education Establishments)

Contact the organisation

SCHNEIDER ELECTRIC INDUSTRIES SAS
France

Aportación de la UE: EUR 492 625


RUE JOSEPH MONIER 35
92500 RUEIL MALMAISON
France
Activity type: Private for-profit entities (excluding Higher or Secondary Education Establishments)

Contact the organisation

IGE ENERGY SERVICES (UK) LIMITED
United Kingdom

Aportación de la UE: EUR 1 284 937,50


THE ARENA DOWNSHIRE WAY
RG12 1PU BRACKNELL BERKSHIRE
United Kingdom
Activity type: Private for-profit entities (excluding Higher or Secondary Education Establishments)

Contact the organisation

ATENDE SPOLKA AKCYNA
Poland

Aportación de la UE: EUR 486 718,25


OSTROBRAMSKA 86
04-163 WARSZAWA
Poland
Activity type: Private for-profit entities (excluding Higher or Secondary Education Establishments)

Contact the organisation

POLITECHNIKA GDANSKA
Poland

Aportación de la UE: EUR 210 625


UL. GABRIELA NARUTOWICZA 11/12
80-233 GDANSK
Poland
Activity type: Higher or Secondary Education Establishments

Contact the organisation

INSTYTUT ENERGETYKI
Poland

Aportación de la UE: EUR 377 250


UL. MORY 8
01 330 WARSZAWA
Poland
Activity type: Research Organisations

Contact the organisation

ASOCIACION INSTITUTO TECNOLOGICO DE LA ENERGIA
Spain

Aportación de la UE: EUR 181 075


Avda Juan de la Cierva 24
46022 Paterna
Spain
Activity type: Research Organisations

Contact the organisation

ENTE VASCO DE LA ENERGIA
Spain

Aportación de la UE: EUR 79 450


Alameda Urquijo Edificio Plaza Bizkaia 36, 1º
48011 BILBAO
Spain
Activity type: Public bodies (excluding Research Organisations and Secondary or Higher Education Establishments)

Contact the organisation

Síganos en: RSS Facebook Twitter YouTube Gestionado por la Oficina de Publicaciones de la UE Arriba