Skip to main content
European Commission logo print header

Validated Surge Model

Cel

Filton Systems Engineering (FSE) intends to establish methodologies, which have been verified using test data, to provide validated accurate surge pressure predictions within aircraft fuel systems. This would replace physical Aerospace Test Rigs with a virtual test rig to reduce development cost and lead-time by improving the robustness/integrity of surge/ two phase flow fluid modelling. This allows aerospace companies to optimise architecture early in the design phase minimising installation and structural weight, increasing aircraft efficiency, thereby lowering operating cost and also reducing carbon footprint.
Commercial realisation of the programme is through the sale of services/methodologies to aerospace customers and also potentially through the sale of validation test data to software houses to improve their marketing position relative to claims for predicting surge pressures; and the expansion of methodologies to cover fluid applications in other industries.
FSE is uniquely positioned to succeed within this task due to existing surge analysis, test management and rig specification capabilities which will also protect further work that develop from this programme of work.
The feasibility study undertaken under Phase 1 will comprise:
1. IP investigation
a. Current IP for similar methodologies
b. Use of IP to protect methodologies
c. Use of copyright to protect data
2. Potential commercial arrangements with final customers
a. Requirements
b. Use of data, services & methodologies
3. Potential commercial arrangements with software house
a. Support for commercial code
b. Use of validation test data
4. Statement of Work for Phase 2 (inc. plan & budget)
5. Top level test facility requirements
6. Top level test requirements
7. Produce Comprehensive Feasibility Report
If Phase 1 is successful, further funding will be applied for under Horizon 2020 Phase 2 with FSE providing the balance of the funding. It is estimated that Phase 2 will take a further 2½ years.

Zaproszenie do składania wniosków

H2020-SMEInst-2014-2015

Zobacz inne projekty w ramach tego zaproszenia

Szczegółowe działanie

H2020-SMEINST-1-2014

Koordynator

FILTON SYSTEMS ENGINEERING LTD
Wkład UE netto
€ 50 000,00
Adres
49 HIGH STREET THORNBURY
BS35 2AR BRISTOL
Zjednoczone Królestwo

Zobacz na mapie

MŚP

Organizacja określiła się jako MŚP (firma z sektora małych i średnich przedsiębiorstw) w czasie podpisania umowy o grant.

Tak
Region
South West (England) Gloucestershire, Wiltshire and Bristol/Bath area Bath and North East Somerset, North Somerset and South Gloucestershire
Rodzaj działalności
Private for-profit entities (excluding Higher or Secondary Education Establishments)
Linki
Koszt całkowity
€ 71 429,00