New Concrete-Towers Assembly system for taller Wind Turbines.

Obiettivo

Skyscrapers building technology marked a turning point in the construction sector: Due to the great heights of those buildings, the only way to build them is with a crane which rises in the manner the skyscraper does. Inspired by that idea, we developed the AIRCRANE SYSTEM. The wind energy sector currently has a main objective: decrease the Levelized Cost of produced Energy (LCoE), in order to be comparable to other energy sources in the coming years. The strategies to decrease are mainly concentrated in two action groups: Reduce the cost of wind turbines and capture as much energy as possible. Regarding the second group, manufacturers are convinced the best way is to create more powerful turbines (up to 8 MW) and install the nacelle and rotor at greater heights, where the wind blows harder and there are less turbulences. The market requires taller towers, supporting heavier loads on top as well. The only alternative, due to steel tower's limitations, is to make at least the lower part with concrete. But the concrete weak point is its weight, which requires the use of largest crawlers and cranes: very expensive machines and with a limited number of units worldwide. The AIRCRANE SYSTEM is a brand new technology that serves to assembly concrete wind-turbine towers, with theoretically infinite height: the Aircrane system is based on a external self-climbing crane which rises as the construction of the tower does, once its completed and built, the system will lift the nacelle and blades. There are two main advantages: (1) Radically reduce current construction costs in the tallest concrete towers, and additionally (2) open a new market-niche, being able to construct towers with no height limits. Successful project completion represents a significant business opportunity for our SME, with expected REVENUES of € 32,5/58,5 million within 5/7 years and the creation of 98/167 Direct Jobs, and 176/307 Indirect jobs

Invito a presentare proposte

H2020-SMEInst-2016-2017

Vedi altri progetti per questo bando

Bando secondario

H2020-SMEINST-2-2016-2017

Meccanismo di finanziamento

SME-2 - SME instrument phase 2

Coordinatore

HWS CONCRETE TOWERS SL
Contribution nette de l'UE
€ 1 487 587,50
Indirizzo
CALLE PUIO 10 3 A
20009 DONOSTIA SAN SEBASTIAN GIPUZKOA
Spagna

Mostra sulla mappa

PMI

L’organizzazione si è definita una PMI (piccola e media impresa) al momento della firma dell’accordo di sovvenzione.

Regione
Noreste País Vasco Gipuzkoa
Tipo di attività
Private for-profit entities (excluding Higher or Secondary Education Establishments)
Collegamenti
Costo totale
€ 2 125 125,00