IP1 Traction TD1 and Brakes TD5 – Phase 2

IP1 Traction TD1 and Brakes TD5 – Phase 2

Objective

The PINTA2 Project (IP1 Traction TD1 and Brakes TD5 – Phase 2) will address the two key topics highlighted in the Shift2Rail Call topic S2R-CFM-IP1-01-2018 – Development of concepts towards the next generation of traction systems and management of wheel/rail adhesion, namely Traction and Adhesion Management.

PINTA2 will continue, fully in line with PINTA Phase1, to work on Traction & Adhesion improvements of seven technical and economical KPIs of the Traction system that have been agreed and defined in PINTA (fully in line with S2R KPIs). These performances will be improved on five different train applications having different constraints, needs and specificities, from tramway to HST, including metro, sub-urban, regional trains. In particular, Traction sub-project will address the following KPIs: 1) Line capacity increase through weight, volume and noise savings of Traction equipment. 2) Reduction of Maintenance costs via higher reliability/availability and optimized for maintenance Traction components. 3) Railway system LCC reduction via higher energy efficiency and optimized capital cost of the Traction systems.

On Brakes Adhesion side, the work will lead to the achievement of a number of important objectives such as · higherTRL levels of improvement of braking degradation limit in poor adhesion condition · Management of all adhesion conditions in a way that brake distances are optimized · Improvement of the overall train safety, which relies substantially on the management of the wheel/rail contact · Reduction of wheel Life-Cycle-Costs (LCCs) through optimized wheel/rail contact in braking The activities will contribute in developing new performance solutions for Adhesion.

The work done in PINTA2 will consist in higher achievement ( up to TRL6) to prepare the final Phase3 work and future TRL7 demonstration on trains, at least Metro, Regional and HST expected around 2021-22.

Coordinator

ALSTOM TRANSPORT SA

Address

48 Rue Albert Dhalenne
93400 Saint Ouen

France

Activity type

Other

EU Contribution

€ 6 242 483,75

Participants (8)

Sort alphabetically

Sort by EU Contribution

Expand all

BOMBARDIER TRANSPORTATION SWEDEN AB

Sweden

EU Contribution

€ 929 938,75

CAF POWER & AUTOMATION SL

Spain

EU Contribution

€ 1 774 137,50

DEUTSCHE BAHN AG

Germany

EU Contribution

€ 257 751,25

FAIVELEY TRANSPORT ITALIA SPA

Italy

EU Contribution

€ 692 916,25

KNORR-BREMSE SYSTEME FUR SCHIENENFAHRZEUGE GMBH

Germany

EU Contribution

€ 443 936,25

SIEMENS MOBILITY GMBH

Germany

EU Contribution

€ 1 399 887,50

SNCF MOBILITES

France

EU Contribution

€ 99 623,75

PATENTES TALGO SL

Spain

EU Contribution

€ 839 916,25

Project information

Grant agreement ID: 826054

Status

Ongoing project

  • Start date

    1 September 2018

  • End date

    30 November 2020

Funded under:

H2020-EU.3.4.8.1.

Coordinated by:

ALSTOM TRANSPORT SA

France