Objective
After the success of the H2020 ESSνSB Design Study proving the feasibility of the upgrade of the European Spallation Source to become, in addition to a neutron facility, also a very competitive neutrino facility, we propose here a study to reinforce and develop complementary features to this proposal in order to improve and widen the scientific and technological scope.
The key objective of the H2020 ESSνSB Design Study was to demonstrate the feasibility of using the European Spallation Source (ESS) proton linac to produce the world's most intense neutrino beam concurrently with the 5 MW proton beam to be used for the production of spallation neutrons. After accomplishing all deliverables and the publication of the ESSνSB CDR, this is now fully demonstrated. With the present Design Study, it is proposed to take further steps towards its realization by introducing complementary studies and enlarging its scope by making studies on synergetic aspects of the project.
The ESSνSB+ high-level objectives are to:
• Study the civil engineering needed for the facility implementation at the ESS site as well as those needed for the ESSνSB far detector site.
• Study the feasibility and implementation of a special target station for pion production and extraction for injection to a low energy nuSTORM decay ring and to a low energy Monitored Neutrino Beam decay tunnel, for neutrino cross-section measurements.
• Study the low energy nuSTORM decay ring and the injection of the pions and muons from the special target station.
• Study the low energy ENUBET-like Monitored Neutrino Beam decay tunnel and the injection of the pions and muons from the special target station.
• Study the capabilities of the proposed setup for sterile neutrino searches and astroparticle physics.
• Promote the ESSνSB project proposal to its stakeholders, including scientists, politicians, funders, industrialists and the general public in order to pave the way to include this facility in the ESFRI list.
Fields of science
Programme(s)
Funding Scheme
RIA - Research and Innovation action
Coordinator
75794 Paris
France
See on map
Participants (18)
Legal entity other than a subcontractor which is affiliated or legally linked to a participant. The entity carries out work under the conditions laid down in the Grant Agreement, supplies goods or provides services for the action, but did not sign the Grant Agreement. A third party abides by the rules applicable to its related participant under the Grant Agreement with regard to eligibility of costs and control of expenditure.
67081 Strasbourg
See on map
10000 Zagreb
See on map
751 05 Uppsala
See on map
22100 Lund
See on map
224 84 Lund
See on map
100 44 Stockholm
See on map
20148 Hamburg
See on map
01330 Adana
See on map
15341 Agia Paraskevi
See on map
Legal entity other than a subcontractor which is affiliated or legally linked to a participant. The entity carries out work under the conditions laid down in the Grant Agreement, supplies goods or provides services for the action, but did not sign the Grant Agreement. A third party abides by the rules applicable to its related participant under the Grant Agreement with regard to eligibility of costs and control of expenditure.
546 36 Thessaloniki
See on map
1504 Sofia
See on map
971 87 Lulea
See on map
1211 Geneve 23
See on map
00154 Roma
See on map
20126 Milano
See on map
00044 Frascati
See on map
Legal entity other than a subcontractor which is affiliated or legally linked to a participant. The entity carries out work under the conditions laid down in the Grant Agreement, supplies goods or provides services for the action, but did not sign the Grant Agreement. A third party abides by the rules applicable to its related participant under the Grant Agreement with regard to eligibility of costs and control of expenditure.
35122 Padova
See on map
48160 Derio
See on map
Partners (1)
464 8601 Nagoya
See on map