Elimination of manual handling
From 1990-01-01
to 1991-06-30
Project details
Total cost:
Not available
EU contribution:
Not available
Coordinated in:
France
Objective
1) Collaboration with users with a view to drawing up specifications.
2) Study of the specifications in collaboration with the engineering company and submission of plan to SOLMER.
3) Examination of plans by SOLMER and discussions with users with a view to any requisite modifications.
4) Discussions with the engineering company on proposed modifications.
5) We are currently in a contractual phase for the implementation and follow-up of part of the project (ie the loading workstation).
6) Measuring and control techniques and criteria to be observed during the work
Compliance with specifications and deadlines.
7) Reception testing
Tests to be carried out on:
- prehensile power (for gripping samples)
- safety
- displacement speed
- positioning
- automated systems
- thickness measuring
- cut sample gripping system.
Coordinator
Usine de Fos
13776 Fos Sur Mer
France
See on mapAdministrative contact: Michel CORNEVIN
Tel.: +33-42473333