Objectif CargoSpeed - Cargo rail/road interchange at Speed - will support the sustainable flow of cargo from road to rail and will reduce the congestion problems on the roads within Europe. The system will reduce the costs for road/rail intermodalism and will increase the speed of the operation at combined terminals. It will halve the economic break-even distance for intermodal freight movements. The reduction of costs of the complete system in comparison to common techniques will be at least to 30 %. Outcome of the project are two prototypes. A CargoSpeed rail-wagon and a transfer mechanism. A specific well floor for the wagon and a POP-UP lifting and turning mechanism will be constructed and demonstrated. In order to achieve a reliable and cost efficient system a simulation and animation of the terminal will be prepared and comprehensive dissemination and exploitation measurements will be carried out. The marketability will be proved. Programme(s) FP5-GROWTH - Programme for research technological development and demonstration on "Competitive and sustainable growth 1998-2002" Thème(s) 1.1.3.-3. - Key Action Land Transport and Marine Technologies Appel à propositions Data not available Régime de financement CSC - Cost-sharing contracts Coordinateur BLG CONSULT GMBH Contribution de l’UE Aucune donnée Adresse Faulenstr. 23 28195 BREMEN Allemagne Voir sur la carte Coût total Aucune donnée Participants (1) Trier par ordre alphabétique Trier par contribution de l’UE Tout développer Tout réduire THE WARBRECK ENGINEERING AND DRY DOCK COMPANY LTD Royaume-Uni Contribution de l’UE Aucune donnée Adresse Regent Road 12-16a L3 7DS LIVERPOOL Voir sur la carte Coût total Aucune donnée