Cel In the pilot/demonstration project the technology of the injection of reducing gas into the blast furnace is developed and injection rates are maximised. The goal is to achieve a specific injection rate of 330 Nm³/tHm reducing gas, which is an increase of 20% when compared to the injection rate of 260 Nm³/tHm for natural gas as state-of-the-art. The main emphasis in this project lies on the use of the by-product gases from the BOF process and coke production. They shall substitute alternative reducing agents, which are purchased from outside sources. The work program in this multi-partner/multi-national project focuses on the development, design and installation of a pilot plant for injecting 25,000 Nm³/h BOF gas and coke oven gas into the blast furnace 5 at VASL. The influence of ultrahigh injection rate of reducing gas on the output an consumption figures of the blast furnace will be investigated. Program(-y) ECSC-STEEL C - Medium-term guidelines for the ECSC steel RTD programme of research and pilot/demonstration projects, 1996-2002 Temat(-y) T1 - Iron and steelmaking Zaproszenie do składania wniosków Data not available System finansowania CSC - Cost-sharing contracts Koordynator VOESTALPINE STAHL GMBH Wkład UE Brak danych Adres VOEST-ALPINE-Strasse 3 4020 LINZ Austria Zobacz na mapie Linki Strona internetowa Opens in new window Koszt całkowity Brak danych Uczestnicy (1) Sortuj alfabetycznie Sortuj według wkładu UE Rozwiń wszystko Zwiń wszystko MEFOS, FOUNDATION FOR METALLURGICAL RESEARCH Szwecja Wkład UE Brak danych Adres Aronstorpsvägen 1 971 25 LULEÅ Zobacz na mapie Koszt całkowity Brak danych