The injection of ultrahigh rates of reducing gases into a modern blast furnace

Cel

In the pilot/demonstration project the technology of the injection of reducing gas into the blast furnace is developed and injection rates are maximised. The goal is to achieve a specific injection rate of 330 Nm³/tHm reducing gas, which is an increase of 20% when compared to the injection rate of 260 Nm³/tHm for natural gas as state-of-the-art. The main emphasis in this project lies on the use of the by-product gases from the BOF process and coke production. They shall substitute alternative reducing agents, which are purchased from outside sources. The work program in this multi-partner/multi-national project focuses on the development, design and installation of a pilot plant for injecting 25,000 Nm³/h BOF gas and coke oven gas into the blast furnace 5 at VASL. The influence of ultrahigh injection rate of reducing gas on the output an consumption figures of the blast furnace will be investigated.

Zaproszenie do składania wniosków

Data not available

System finansowania

CSC - Cost-sharing contracts

Koordynator

VOESTALPINE STAHL GMBH
Wkład UE
Brak danych
Adres
VOEST-ALPINE-Strasse 3
4020 LINZ
Austria

Zobacz na mapie

Linki
Koszt całkowity
Brak danych