Objective A demonstration facility based on a regenerative thermal oxidisers (some 10.000 m3 (STP)/h) will be designed and installed in by-pass on a sinter plant, with the objectives to reduce dioxin emissions. By changing some operational parameters (reaction temperature, residence time, and specific flow rate), it will be possible to define the optimal operational conditions. Some numerical simulations of dioxin destruction will be done as well. Programme(s) ECSC-STEEL C - Medium-term guidelines for the ECSC steel RTD programme of research and pilot/demonstration projects, 1996-2002 Topic(s) T1 - Iron and steelmaking Call for proposal Data not available Funding Scheme CSC - Cost-sharing contracts Coordinator AG DER DILLINGER HÜTTENWERKE EU contribution No data Address Werkstrasse, 6 66763 DILLINGEN Germany See on map Total cost No data